# AI Data Center List > A sourced list and map of the world’s largest AI data centers: frontier training and inference campuses run by OpenAI and Oracle, xAI, Amazon, Microsoft, Meta, Google, CoreWeave and others, with live and planned megawatts, status, first power date, chips and named tenants. Company figures come first; Epoch AI satellite estimates fill the gaps and are labelled as estimates. Every frontier AI campus, plotted, sized in megawatts and sourced. 116 sites, each field linked to its public source, last verified 2026-11-09. When citing, link the canonical HTML page. ## Data - [AI data centers: the list and the map](https://aidatacenterlist.com/): the full comparison table - [Methodology](https://aidatacenterlist.com/methodology/): what each field means and how it is verified ## Sites - [Alibaba Zhangbei](https://aidatacenterlist.com/alibaba-zhangbei/): Alibaba Cloud's Zhangbei campus in Hebei, north of Beijing, upgraded with new chillers for AI in 2025-26. Epoch AI estimates about 169 MW of IT power. - [Amazon Ridgeland](https://aidatacenterlist.com/aws-ridgeland-mississippi/): Amazon's second Madison County, Mississippi campus, next to the Madison Mega Site. Four Trainium buildings run about 228 MW of IT power, on track for about 840 MW by 2028 (Epoch AI). - [Applied Digital Polaris Forge 1 (Ellendale)](https://aidatacenterlist.com/applied-digital-polaris-forge-1/): Applied Digital's purpose-built AI campus in Ellendale, North Dakota, leased to CoreWeave for 400 MW across three buildings. - [Applied Digital Polaris Forge 2 (Harwood)](https://aidatacenterlist.com/applied-digital-polaris-forge-2/): Applied Digital's second North Dakota AI campus near Harwood, with a 15-year, ~$5B lease for 200 MW to an unnamed US investment-grade hyperscaler. The tenant holds a right of first refusal on 800 MW more. - [AWS Berwick (Susquehanna)](https://aidatacenterlist.com/aws-berwick-susquehanna/): The former Talen Cumulus campus beside the Susquehanna nuclear plant, bought by AWS for $650M and planned for 16 buildings. Epoch AI estimates about 108 MW of IT power in use. - [AWS Madison County (Canton, Mississippi)](https://aidatacenterlist.com/aws-madison-county-mississippi/): A $10 billion AWS campus at the Madison Mega Site near Canton, Mississippi. SemiAnalysis and Epoch AI link it to Anthropic and Trainium; Amazon has not confirmed the tenant. - [AWS New Albany](https://aidatacenterlist.com/aws-new-albany/): Amazon's $3.5B New Albany, Ohio campus, running Trainium2 and Nvidia GPUs. Epoch AI estimates 213 MW of IT power today and about 338 MW once the northern campus is finished in 2027. - [AWS Project Rainier (New Carlisle)](https://aidatacenterlist.com/aws-project-rainier-new-carlisle/): Amazon's Project Rainier campus in St. Joseph County, Indiana, built for Anthropic on AWS Trainium2 chips. Amazon says Rainier spans multiple US data centers with nearly half a million Trainium2 chips. - [Bridge Data Centres MY06 (Sedenak)](https://aidatacenterlist.com/bridge-my06-sedenak/): A hyperscale campus at Sedenak Tech Park in Johor linked to ByteDance, which opened its first phase with Bridge in 2022. Epoch AI estimates 243 MW of IT power in use; buildings 8-10 look built but idle. - [Cipher Barber Lake (Fluidstack)](https://aidatacenterlist.com/cipher-barber-lake/): Cipher Mining's Barber Lake site in Texas, leased for 10 years to Fluidstack with Google backing. Cipher's SEC filing gives 207 MW of critical IT load across two phases. - [Core Scientific Denton (CoreWeave)](https://aidatacenterlist.com/core-scientific-denton/): A former bitcoin-mining site in Denton, Texas converted by Core Scientific into high-density AI halls for CoreWeave. The WSJ reported the capacity is rented to OpenAI. - [Core42 at Lake Mariner](https://aidatacenterlist.com/core42-lake-mariner/): Core42's two leased halls at TeraWulf's Lake Mariner campus in western New York, separate from the Fluidstack halls. Epoch AI estimates about 58 MW of IT power. - [CoreWeave at Bulk N01](https://aidatacenterlist.com/coreweave-bulk-n01-norway/): CoreWeave's capacity at Bulk Infrastructure's N01 campus in southern Norway, on hydro power. Epoch AI estimates about 42 MW of IT power live since 2025. - [CoreWeave Chester](https://aidatacenterlist.com/coreweave-chester/): A former Capital One data center in Chester, Virginia that Chirisa refitted for CoreWeave. Two buildings run about 82 MW of IT power, with a third under way (Epoch AI). - [CoreWeave Dalton](https://aidatacenterlist.com/coreweave-dalton/): Core Scientific's Dalton, Georgia AI buildings for CoreWeave, completed in late 2025. Epoch AI estimates about 28 MW of IT power with B300s. - [CoreWeave Lancaster](https://aidatacenterlist.com/coreweave-lancaster/): CoreWeave's $6 billion plan to build AI data centers on two former printing-press sites in Lancaster, Pennsylvania. The first building was still being fitted out in July 2026. - [CoreWeave Marble](https://aidatacenterlist.com/coreweave-marble/): Core Scientific's Marble, North Carolina site, fully handed over to CoreWeave in 2026 with about 65 MW of billable power. - [CoreWeave Muskogee](https://aidatacenterlist.com/coreweave-muskogee/): A Core Scientific build at Port Muskogee, Oklahoma, broken ground as a 100 MW HPC data center for CoreWeave. Epoch AI expects building 1 live around end-2026. - [Crusoe Abilene expansion (Microsoft)](https://aidatacenterlist.com/crusoe-abilene-microsoft/): A 900 MW Crusoe campus next to Stargate Abilene, announced in March 2026 for Microsoft workloads after Oracle and OpenAI dropped their expansion. Two data halls with an on-site power plant. - [DayOne Kempas](https://aidatacenterlist.com/dayone-kempas/): DayOne's second big Johor campus, a few kilometres from Nusajaya. Epoch AI puts it at about 422 MW of IT power after buildings 7-8 came online in October 2026, making it one of the largest AI sites outside the US. - [DayOne Nusajaya Tech Park](https://aidatacenterlist.com/dayone-nusajaya/): DayOne's (formerly GDS International) campus in Nusajaya Tech Park, Johor, Malaysia. The Financial Times has reported Chinese AI firms training models in Johor; the site's tenants are not public. - [EcoDataCenter 2 Borlänge (Mistral AI)](https://aidatacenterlist.com/ecodatacenter-borlange-mistral/): EcoDataCenter's new campus in Borlänge, Sweden, where Mistral AI is the AI partner. The first two buildings were roofed in August 2026 with installation work due to finish by mid-2027. - [Envision Galaxy Ulanqab](https://aidatacenterlist.com/envision-galaxy-ulanqab/): An Inner Mongolia AI campus in Ulanqab that Epoch AI names after Envision, running Huawei Ascend 950 chips. Building 1 came online in November 2026 at about 118 MW of IT power, with about 470 MW planned by end-2027. - [Fermi America Project Matador (HyperGrid)](https://aidatacenterlist.com/fermi-america-project-matador/): Fermi America's private-grid AI campus beside Pantex near Amarillo, Texas, now projected at 17 GW. TensorWave signed a 15-year lease for the first 222 MW of AMD GPU capacity in August 2026, and the first gas turbines are on site. - [Firmus Project Southgate (Melbourne)](https://aidatacenterlist.com/firmus-southgate-melbourne/): Firmus's Project Southgate AI factory in Melbourne, hosted at a CDC campus, with 18,400 Nvidia GB300 GPUs for a global hyperscale customer. Part of a wider Southgate build across Tasmania and mainland Australia. - [Galaxy Helios (CoreWeave)](https://aidatacenterlist.com/galaxy-helios/): Galaxy Digital's Helios campus in Dickens County, West Texas, fully leased to CoreWeave in three phases. Phase I was due by mid-2026, Phase II through 2027 and Phase III from 2028. - [Google AI Hub Visakhapatnam](https://aidatacenterlist.com/google-visakhapatnam-ai-hub/): Google's $15 billion gigawatt-scale AI hub in Visakhapatnam, India, built with AdaniConneX and Nxtra by Airtel. Ground was broken on 28 April 2026. - [Google Arcola](https://aidatacenterlist.com/google-arcola/): Google's Arcola campus in Loudoun County, Virginia. Building 1 came online in June 2026 at about 77 MW of IT power (Epoch AI). - [Google Armstrong County (Goodnight)](https://aidatacenterlist.com/google-armstrong-county-goodnight/): Google's Armstrong County campus outside Amarillo, developed by Crusoe and wired straight into the Goodnight wind farm. Epoch AI projects about 1 GW of IT power by late 2027, which would make it one of Google's largest sites. - [Google Bristow](https://aidatacenterlist.com/google-bristow/): Google's Northern Virginia TPU campus in Bristow. Three buildings run TPUs up to v7 at about 238 MW of IT power (Epoch AI). - [Google Cedar Rapids](https://aidatacenterlist.com/google-cedar-rapids/): Google's Cedar Rapids, Iowa campus, with a 600 MW load request filed with MISO. Building 1 is due around end-2026 and Epoch AI projects about 261 MW of IT power by mid-2027. - [Google Columbus (South High Street)](https://aidatacenterlist.com/google-columbus-ohio/): One of Google's three central Ohio campuses, running TPUs up to v7 per Epoch AI. A fifth building is due by mid-2027 per an AEP transmission notice. - [Google Council Bluffs (East)](https://aidatacenterlist.com/google-council-bluffs-east/): The newer eastern campus at Google's long-running Council Bluffs, Iowa hub. Three buildings run TPUs up to v7 at about 237 MW of IT power, with ground cleared for two more. - [Google Fort Wayne](https://aidatacenterlist.com/google-fort-wayne/): Google's Fort Wayne, Indiana campus approved by the city council in December 2023. Building 2 was being commissioned in August 2026 and six buildings are planned. - [Google Haskell County](https://aidatacenterlist.com/google-haskell-county/): Two Google data centers in Haskell County near Abilene, part of Google's $40B Texas build-out through 2027. One sits beside a new Intersect solar and battery plant, Google's first co-located energy park. - [Google Kansas City (Hunt Midwest)](https://aidatacenterlist.com/google-kansas-city-east/): Google's $1B data center at the Hunt Midwest Business Center in Kansas City, Missouri. Building 1 came online around August 2026 at about 105 MW of IT power by Epoch AI's estimate. - [Google Lancaster](https://aidatacenterlist.com/google-lancaster-ohio/): The third of Google's central Ohio AI sites, southeast of Columbus. Two buildings run about 137 MW of IT power (Epoch AI). - [Google Lincoln](https://aidatacenterlist.com/google-lincoln/): Google's Lincoln, Nebraska campus, planned in seven phases. Building 1 went live in May 2026 at about 141 MW of IT power, with building 2 close behind (Epoch AI). - [Google Mesa](https://aidatacenterlist.com/google-mesa/): Google's Mesa, Arizona campus, running TPU v5p and v6e. Building 2 came online in 2026, taking it to about 183 MW of IT power by Epoch AI's estimate. - [Google Midlothian](https://aidatacenterlist.com/google-midlothian/): Google's Midlothian campus south of Dallas, running TPU v6e and v7. Building 1 reached about 103 MW of IT power in mid-2026 (Epoch AI). - [Google New Albany](https://aidatacenterlist.com/google-new-albany/): Google's TPU campus in New Albany, outside Columbus, one of three Google AI sites in central Ohio. Epoch AI estimates 333 MW of IT power across five buildings. - [Google Omaha](https://aidatacenterlist.com/google-omaha/): Google's Omaha, Nebraska TPU campus. Three buildings run about 237 MW of IT power, rising to roughly 395 MW by 2028 on Epoch AI's projection. - [Google Papillion](https://aidatacenterlist.com/google-papillion/): Google's Papillion campus outside Omaha, running TPU v4 through v5p. Epoch AI estimates about 237 MW of IT power, with buildings 4-5 under construction. - [Google Pryor](https://aidatacenterlist.com/google-pryor/): Google's Pryor, Oklahoma campus, home of its 2022 TPU v4 cluster and a large 2025-26 expansion. Epoch AI ranks the north campus among the top five AI sites by compute. - [Google Red Oak](https://aidatacenterlist.com/google-red-oak/): Google's Red Oak campus south of Dallas. Building 1 runs about 77 MW of IT power and building 2 is due by December 2026, doubling it (Epoch AI). - [Google Storey County (Tahoe Reno)](https://aidatacenterlist.com/google-storey-county/): Google's Nevada campus at the Tahoe Reno Industrial Center. Epoch AI estimates about 161 MW of IT power today and about 300 MW once buildings 3-4 are done in 2027. - [Google The Dalles](https://aidatacenterlist.com/google-the-dalles/): Google's original data center town on the Columbia River, now running TPUs up to v7. Epoch AI tracks the newest AI facility at about 154 MW of IT power. - [Google Waltham Cross](https://aidatacenterlist.com/google-waltham-cross/): Google's first UK-owned data centre, opened in September 2025 north of London as part of a GBP 5B UK investment. Epoch AI estimates about 88 MW of IT power, fully built. - [Huawei Horinger](https://aidatacenterlist.com/huawei-horinger/): Huawei Cloud's Inner Mongolia AI campus near Hohhot, running Ascend chips. Epoch AI estimates about 170 MW of IT power, roughly doubling by 2028. - [Huawei Wuhu](https://aidatacenterlist.com/huawei-wuhu/): Huawei Cloud's Wuhu, Anhui AI campus, running Ascend 910 and 950 series chips. Five buildings run about 197 MW of IT power, heading to about 453 MW by end-2027 (Epoch AI). - [Humain Dammam campus](https://aidatacenterlist.com/humain-dammam/): Humain's second first-wave campus, in Dammam in Saudi Arabia's Eastern Province, starting at 100 MW. Built alongside the Riyadh campus on the same schedule. - [Humain Riyadh campus](https://aidatacenterlist.com/humain-riyadh/): One of two first campuses from Humain, Saudi Arabia's PIF-backed AI company, starting at 100 MW with Nvidia and AMD chips. AWS and Humain plan a $5B 'AI Zone' in Riyadh. - [IREN Childress (Horizon)](https://aidatacenterlist.com/iren-childress/): IREN's 750 MW Childress, Texas campus, where four liquid-cooled 'Horizon' halls host Nvidia GB300 capacity for Microsoft under a $9.7B, five-year contract. Horizon 1 went live in August 2026; Horizons 2-4 land in early 2027 after a Microsoft network redesign. - [IREN Sweetwater Hub](https://aidatacenterlist.com/iren-sweetwater/): IREN's 2 GW Sweetwater hub in West Texas: Sweetwater 1 (1.4 GW, substation energized 2026) and Sweetwater 2 (600 MW). 300 MW gross of data halls is being built at Sweetwater 1. - [Lambda Kansas City AI factory](https://aidatacenterlist.com/lambda-kansas-city/): Lambda's conversion of a vacant 2009 building in Kansas City, Missouri into an AI factory for one customer under a multi-year deal. 24 MW to start with 10,000+ Nvidia Blackwell Ultra GPUs, scaling past 100 MW. - [Meta Aiken](https://aidatacenterlist.com/meta-aiken/): Meta's Aiken County, South Carolina data center, built by DPR. Building 2 came online in November 2026, about 129 MW of IT power in all (Epoch AI). - [Meta Bowling Green (Middleton Township)](https://aidatacenterlist.com/meta-bowling-green/): A Meta AI campus near Bowling Green, Ohio, paired with the 350 MW behind-the-meter Apollo gas plant. Buildings 1-2 were under construction in mid-2026. - [Meta Cheyenne](https://aidatacenterlist.com/meta-cheyenne/): Meta's Cheyenne, Wyoming data center, announced in 2024 and built by Fortis. Both buildings were live by July 2026 at about 152 MW of IT power (Epoch AI). - [Meta Eagle Mountain](https://aidatacenterlist.com/meta-eagle-mountain/): Meta's expanded Eagle Mountain, Utah campus, built by Mortenson. Buildings 1 and 2 of the AI expansion are live at about 133 MW of IT power (Epoch AI). - [Meta El Paso](https://aidatacenterlist.com/meta-el-paso/): Meta's El Paso, Texas campus, broken ground in October 2025 and raised in March 2026 from $1.5B to $10B for about 1 GW. Interim power comes from Enchanted Rock gas units. - [Meta Gallatin](https://aidatacenterlist.com/meta-gallatin/): Meta's Gallatin, Tennessee campus near Nashville. Building 1 came online in August 2026 at about 87 MW of IT power (Epoch AI). - [Meta Huntsville](https://aidatacenterlist.com/meta-huntsville/): Meta's Huntsville, Alabama campus, powered with TVA and contracted solar. Its 2026 expansion brought it to about 146 MW of IT power (Epoch AI). - [Meta Hyperion (Richland Parish)](https://aidatacenterlist.com/meta-hyperion/): Meta's largest planned AI cluster, in Richland Parish, Louisiana, with $50B+ of investment. Entergy is building gas generation for the site. - [Meta Jeffersonville](https://aidatacenterlist.com/meta-jeffersonville/): Meta's Jeffersonville, Indiana campus across the river from Louisville, built by Turner. Buildings 1 and 2 came online in mid-2026 at about 178 MW of IT power (Epoch AI). - [Meta Kuna](https://aidatacenterlist.com/meta-kuna/): Meta's Kuna, Idaho data center near Boise. Two buildings came online in mid-2026 at about 152 MW of IT power, matched by new Idaho Power solar arrays. - [Meta Los Lunas](https://aidatacenterlist.com/meta-los-lunas/): Meta's Los Lunas, New Mexico campus, where a tent-style AI building went live in October 2026. Epoch AI estimates about 118 MW of IT power, rising to about 218 MW by 2028. - [Meta Montgomery](https://aidatacenterlist.com/meta-montgomery/): Meta's Montgomery, Alabama campus, built by Hensel Phelps and expanded in 2025. Buildings 1-2 run about 153 MW of IT power, more than doubling to about 358 MW by early 2027 (Epoch AI). - [Meta Prometheus (New Albany)](https://aidatacenterlist.com/meta-prometheus/): Meta's first gigawatt-scale AI training cluster in New Albany, Ohio, mixing permanent buildings, tent structures and leased Vantage halls. On-site gas plants (Socrates projects) add power. - [Meta Rosemount](https://aidatacenterlist.com/meta-rosemount/): Meta's Rosemount, Minnesota data center, announced in 2024. Buildings 1 and 2 came online in mid-2026 with NVIDIA Blackwell, about 178 MW of IT power by Epoch AI's estimate. - [Meta Sarpy](https://aidatacenterlist.com/meta-sarpy/): The AI expansion at Meta's Sarpy County, Nebraska campus. Building 1 came online in August 2026 at about 80 MW of IT power (Epoch AI). - [Meta Temple](https://aidatacenterlist.com/meta-temple/): Meta's Temple, Texas campus, built by JE Dunn. Building 3 came online in September 2026, taking the site to about 178 MW of IT power (Epoch AI). - [Microsoft Fairwater Atlanta (Fayetteville)](https://aidatacenterlist.com/microsoft-fairwater-atlanta/): The second Fairwater site, in Fayetteville, Georgia, which began operating in October 2025 and links to Wisconsin over Microsoft's AI WAN as one 'AI superfactory'. Two-story buildings with GB200 NVL72 racks. - [Microsoft Fairwater Wisconsin (Mount Pleasant)](https://aidatacenterlist.com/microsoft-fairwater-wisconsin/): Microsoft's first Fairwater AI datacenter in Mount Pleasant, Wisconsin, built on Nvidia GB200 racks with closed-loop liquid cooling. Building 1 went live in April 2026 and a nine-building expansion is graded. - [Microsoft Goodyear](https://aidatacenterlist.com/microsoft-goodyear/): Microsoft's Goodyear campus west of Phoenix, which SemiAnalysis ties to OpenAI training. Four AI buildings run about 202 MW of IT power, and foundations for buildings 5-6 were going in by April 2026. - [Microsoft Project Osmium (West Des Moines)](https://aidatacenterlist.com/microsoft-osmium-west-des-moines/): Microsoft's West Des Moines-area AI campus, where the supercomputer OpenAI used for GPT-era training was built. Epoch AI estimates about 190 MW of IT power. - [Microsoft SAT14 (San Antonio)](https://aidatacenterlist.com/microsoft-sat14-san-antonio/): Microsoft's SAT14 buildings in San Antonio, expanded in four phases. Epoch AI estimates about 47 MW of IT power running H100 and B300. - [Microsoft SAT40 (San Antonio)](https://aidatacenterlist.com/microsoft-sat40-san-antonio/): Microsoft's SAT40 AI buildings on San Antonio's west side, running H100 and B300. Epoch AI estimates about 75 MW of IT power, fully built. - [Microsoft-G42 UAE expansion (Khazna)](https://aidatacenterlist.com/microsoft-g42-khazna-uae/): 200 MW of new Azure AI capacity in the UAE, built by G42's Khazna Data Centers as part of Microsoft's $15.2B UAE investment. Microsoft says it starts coming online before the end of 2026. - [Mistral AI Bruyères-le-Châtel (Eclairion)](https://aidatacenterlist.com/mistral-bruyeres-le-chatel/): Mistral AI's own compute site at Eclairion's campus in Bruyères-le-Châtel, south of Paris, first built with Fluidstack. Mistral raised $830M of debt in March 2026 for 13,800 Nvidia GB300 GPUs here. - [Nebius Mäntsälä](https://aidatacenterlist.com/nebius-mantsala/): Nebius's home campus in Mäntsälä, Finland, tripled to 75 MW by early 2026 and the site of Europe's first live GB300 NVL72 deployment. - [Nebius Vineland (New Jersey)](https://aidatacenterlist.com/nebius-vineland/): A Nebius AI data center in Vineland, New Jersey, built with developer DataOne, with up to 300 MW planned. It serves Nebius's multi-billion-dollar GPU deal with Microsoft. - [Nscale Keflavik (Verne)](https://aidatacenterlist.com/nscale-keflavik-verne/): Nscale's GB300 NVL72 cluster at Verne's Keflavík campus in Iceland, a 15 MW deployment on geothermal and hydro power. Epoch AI estimates about 5 MW of IT power live, 10 MW by end-2026. - [Nscale Loughton](https://aidatacenterlist.com/nscale-loughton/): Nscale's planned 50 MW (up to 90 MW) AI site in Loughton, Essex, announced as a UK supercomputer for Microsoft. Grid power may not arrive until the 2030s and Microsoft reportedly withdrew in October 2026. - [Oracle Batam (DayOne)](https://aidatacenterlist.com/oracle-batam-dayone/): DayOne's Batam campus across the strait from Singapore, home to Oracle's Batam cloud region. DayOne has stated 72 MW of IT power with an NVIDIA partnership. - [Poolside Project Horizon](https://aidatacenterlist.com/poolside-project-horizon/): Poolside's self-powered AI campus in Pecos County, West Texas, announced in October 2025 at 2 GW with CoreWeave as anchor tenant. The CoreWeave deal ended in early 2026 and the project was later described at 400 MW. - [Project Jade, Cheyenne (Tallgrass)](https://aidatacenterlist.com/crusoe-tallgrass-cheyenne/): Tallgrass's 1.8 GW AI campus south of Cheyenne, Wyoming, approved by Laramie County in January 2026 with a path to 10 GW. Crusoe, the original co-developer, paused its role in June 2026 at a customer's request; the tenant is still unnamed. - [QTS Cedar Rapids (Big Cedar)](https://aidatacenterlist.com/qts-cedar-rapids/): A Blackstone-owned QTS campus at Big Cedar Industrial Center near Cedar Rapids, Iowa, with seven buildings and a 616 MW MISO load request. SemiAnalysis reports Meta as the tenant; QTS has not confirmed. - [QTS Eagle Mountain](https://aidatacenterlist.com/qts-eagle-mountain/): QTS's Eagle Mountain, Utah campus near Meta's own site. Buildings 1-2 are being fitted out, with Epoch AI projecting about 304 MW of IT power by mid-2027. - [QTS Hillsboro 2 (Meta)](https://aidatacenterlist.com/qts-hillsboro-2-meta/): A four-building QTS campus in Hillsboro, Oregon that Epoch AI ties to Meta; QTS and Meta jointly signed a 120 MWac solar deal for Oregon. About 180 MW of IT power is live. - [QTS Richmond 1](https://aidatacenterlist.com/qts-richmond-1/): QTS's first Richmond-area campus in Sandston, Virginia, which Epoch AI tracks as an AI site at about 238 MW of IT power. The tenant is not public. - [QTS Richmond 2](https://aidatacenterlist.com/qts-richmond-2/): The second of QTS's three AI-scale campuses in Sandston, Virginia. Epoch AI estimates about 180 MW of IT power after building 5 came online in 2026. - [QTS Richmond 3](https://aidatacenterlist.com/qts-richmond-3/): QTS's newest Sandston, Virginia campus. Buildings 2 and 3 are live at about 144 MW of IT power, heading to roughly 240 MW (Epoch AI). - [Reliance-Meta Jamnagar AI data centre](https://aidatacenterlist.com/reliance-meta-jamnagar/): A 168 MW AI data centre in Jamnagar, Gujarat that Reliance Industries will design, build and run, with capacity leased to Meta. Announced 10 June 2026 for delivery within two years. - [STACK NVA02 (Manassas)](https://aidatacenterlist.com/stack-nva02-manassas/): STACK's NVA02 campus in Manassas, Virginia, with AI buildings under construction across the site. Epoch AI estimates about 85 MW of IT power today and about 348 MW by 2028. - [Stargate Abilene](https://aidatacenterlist.com/stargate-abilene/): OpenAI's first Stargate campus, built by Crusoe and leased to Oracle, which runs it for OpenAI. Eight buildings on one site; Oracle said in September 2026 that six buildings (618 MW) had been handed over. - [Stargate Argentina (Sur Energy)](https://aidatacenterlist.com/stargate-argentina/): A planned 500 MW, $25B Stargate campus in Patagonia led by Sur Energy, with OpenAI as the intended buyer of its compute. Announced in October 2025; site and financing were still open in May 2026. - [Stargate India (Tata HyperVault)](https://aidatacenterlist.com/stargate-india-tata-hypervault/): OpenAI's Stargate deal in India: it is the first customer of Tata Consultancy Services' HyperVault data center business, starting at 100 MW with a path to 1 GW. - [Stargate Lordstown](https://aidatacenterlist.com/stargate-lordstown/): SoftBank's Stargate site in Lordstown, Ohio. OpenAI said Lordstown and Milam County together could reach 1.5 GW within 18 months of September 2025. - [Stargate Michigan (Saline Township)](https://aidatacenterlist.com/stargate-michigan-saline/): Related Digital's campus in Saline Township, Michigan, a Stargate site with Oracle as operator for OpenAI. The Michigan PSC approved DTE Electric contracts for the load in December 2025. - [Stargate Milam County](https://aidatacenterlist.com/stargate-milam-county/): A 1.2 GW Stargate campus in Milam County, Texas, built and run by SoftBank's SB Energy for OpenAI. SB Energy plans to fund new generation and storage for most of the campus power. - [Stargate New Mexico (Project Jupiter)](https://aidatacenterlist.com/stargate-new-mexico-project-jupiter/): Project Jupiter in Doña Ana County, New Mexico, a Stargate site for OpenAI with Oracle as operator. Power comes from on-site gas microgrids, with Bloom Energy fuel cells announced in April 2026. - [Stargate Norway / Nscale Narvik](https://aidatacenterlist.com/stargate-norway-narvik/): Nscale's hydro-powered campus near Narvik, Norway, first announced as Stargate Norway with Aker and OpenAI. In April 2026 Nscale expanded its Microsoft deal to 230 MW and more than 30,000 Nvidia Rubin GPUs here, for delivery in 2027. - [Stargate Shackelford County (Vantage Frontier)](https://aidatacenterlist.com/stargate-shackelford-county/): Vantage Data Centers' Frontier campus in Shackelford County, Texas, one of five Stargate sites OpenAI announced in September 2025, with Oracle as the cloud operator. Ten buildings are planned. - [Stargate UAE](https://aidatacenterlist.com/stargate-uae/): A 1 GW cluster inside the 5 GW UAE-US AI Campus in Abu Dhabi, built by G42's Khazna Data Centers with OpenAI, Oracle, Nvidia, Cisco and SoftBank. The first 200 MW phase was targeted for Q3 2026. - [Stargate Wisconsin (Port Washington)](https://aidatacenterlist.com/stargate-wisconsin-port-washington/): Vantage Data Centers' campus in Port Washington, Wisconsin, a Stargate site with Oracle as operator for OpenAI. Oracle and Vantage are working with WEC Energy Group on new generation. - [Start Campus Sines (Nscale / Microsoft)](https://aidatacenterlist.com/start-campus-sines/): Start Campus's 1.2 GW SINES campus on Portugal's Atlantic coast. In Q1 2026 Nscale deployed 12,600 Nvidia GB300 GPUs here for Microsoft, the EU's first GB300s. - [Stream Data Centers Phoenix (Goodyear)](https://aidatacenterlist.com/stream-phoenix-goodyear/): Stream's Phoenix-area campus on Litchfield Road in Goodyear. AI building 1 came online around May 2026 at about 64 MW of IT power, with about 220 MW planned by 2030 (Epoch AI). - [Telekom Industrial AI Cloud (Munich)](https://aidatacenterlist.com/telekom-industrial-ai-cloud-munich/): Deutsche Telekom's ~€1B 'AI factory' with Nvidia in a Polarise-operated data center at Munich's Tucherpark, opened in early 2026 for German industry. Built with up to 10,000 Blackwell GPUs. - [TeraWulf Lake Mariner (Fluidstack)](https://aidatacenterlist.com/terawulf-lake-mariner/): TeraWulf's former bitcoin-mining campus on Lake Ontario, converted to AI halls leased to Fluidstack with a Google backstop. Anthropic named New York as a Fluidstack site in its $50B US build-out. - [Tesla Cortex (Giga Texas)](https://aidatacenterlist.com/tesla-cortex-giga-texas/): Tesla's in-house AI training clusters at Gigafactory Texas in Austin, used for FSD and Optimus. Cortex 2 came online in April 2026 next to Cortex 1. - [Vantage TX1 (San Antonio)](https://aidatacenterlist.com/vantage-tx1-san-antonio/): Vantage's TX1 campus in San Antonio. Building 1 runs about 32 MW of IT power with B200s, and two more buildings take it to about 128 MW by 2027 (Epoch AI). - [VNET Ulanqab (Bayin) campus](https://aidatacenterlist.com/vnet-ulanqab/): A VNET hyperscale campus in Ulanqab, Inner Mongolia, part of VNET's '10 GW Hyperscale 2.0' plan. Epoch AI lists ByteDance as a speculative user and Huawei Ascend chips. - [xAI Atlanta (QTS)](https://aidatacenterlist.com/xai-atlanta-qts/): xAI's smaller Atlanta cluster in a QTS building, shared with X and backed by about $700M of AI equipment per county bond documents. Epoch AI estimates about 17 MW of IT power. - [xAI Colossus 1](https://aidatacenterlist.com/xai-colossus-1/): xAI's first Memphis supercomputer, brought up in 2024. In May 2026 Anthropic agreed to use all of its capacity: more than 300 MW and over 220,000 GPUs. - [xAI Colossus 2](https://aidatacenterlist.com/xai-colossus-2/): xAI's second Memphis campus on Tulane Road, built as the first gigawatt-scale AI training site. SpaceX's 2026 S-1 describes a next phase of at least 220,000 more GB300 processors and over 400 MW. - [YTL Green Data Center Park (Kulai)](https://aidatacenterlist.com/ytl-johor-kulai/): YTL's solar-backed AI park in Kulai, Johor, home to its Nvidia Grace Blackwell supercomputer. Two buildings run about 113 MW of IT power, heading to about 284 MW by 2028 (Epoch AI). ## Locations - [All locations](https://aidatacenterlist.com/locations/): campuses by US state and country - [AI data centers in Texas](https://aidatacenterlist.com/us/texas/): 21 campuses - [AI data centers in Ohio](https://aidatacenterlist.com/us/ohio/): 7 campuses - [AI data centers in Virginia](https://aidatacenterlist.com/us/virginia/): 7 campuses - [AI data centers in Iowa](https://aidatacenterlist.com/us/iowa/): 4 campuses - [AI data centers in Nebraska](https://aidatacenterlist.com/us/nebraska/): 4 campuses - [AI data centers in Arizona](https://aidatacenterlist.com/us/arizona/): 3 campuses - [AI data centers in Georgia](https://aidatacenterlist.com/us/georgia/): 3 campuses - [AI data centers in Indiana](https://aidatacenterlist.com/us/indiana/): 3 campuses - [AI data centers in Tennessee](https://aidatacenterlist.com/us/tennessee/): 3 campuses - [AI data centers in Alabama](https://aidatacenterlist.com/us/alabama/): 2 campuses - [AI data centers in Mississippi](https://aidatacenterlist.com/us/mississippi/): 2 campuses - [AI data centers in Missouri](https://aidatacenterlist.com/us/missouri/): 2 campuses - [AI data centers in New Mexico](https://aidatacenterlist.com/us/new-mexico/): 2 campuses - [AI data centers in New York](https://aidatacenterlist.com/us/new-york/): 2 campuses - [AI data centers in North Dakota](https://aidatacenterlist.com/us/north-dakota/): 2 campuses - [AI data centers in Oklahoma](https://aidatacenterlist.com/us/oklahoma/): 2 campuses - [AI data centers in Oregon](https://aidatacenterlist.com/us/oregon/): 2 campuses - [AI data centers in Pennsylvania](https://aidatacenterlist.com/us/pennsylvania/): 2 campuses - [AI data centers in Utah](https://aidatacenterlist.com/us/utah/): 2 campuses - [AI data centers in Wisconsin](https://aidatacenterlist.com/us/wisconsin/): 2 campuses - [AI data centers in Wyoming](https://aidatacenterlist.com/us/wyoming/): 2 campuses - [AI data centers in United States](https://aidatacenterlist.com/country/us/): 87 campuses - [AI data centers in China](https://aidatacenterlist.com/country/cn/): 5 campuses - [AI data centers in Malaysia](https://aidatacenterlist.com/country/my/): 4 campuses - [AI data centers in India](https://aidatacenterlist.com/country/in/): 3 campuses - [AI data centers in Norway](https://aidatacenterlist.com/country/no/): 2 campuses - [AI data centers in Saudi Arabia](https://aidatacenterlist.com/country/sa/): 2 campuses - [AI data centers in United Arab Emirates](https://aidatacenterlist.com/country/ae/): 2 campuses - [AI data centers in United Kingdom](https://aidatacenterlist.com/country/gb/): 2 campuses ## Credit - Built on Epoch AI’s AI data centers dataset (https://epoch.ai/data/ai-data-centers), CC BY 4.0, plus company filings, releases and press reports per campus. Figures marked "Epoch AI estimate" are Epoch AI’s. ## Optional - [All records in one file](https://aidatacenterlist.com/llms-full.txt) - [Sitemap](https://aidatacenterlist.com/sitemap.xml)