Sell into 79 GW of AI campuses

36 of the 116 campuses on this list are still being built or planned. Each one needs transformers, switchgear, turbines, chillers, cold plates, fibre and crews. The people choosing those suppliers, and the analysts and reporters following them, open this list to see who builds what, where and when. Put your company where they look.

The list slot

One sponsor, directly under the AI data center list on the home page and on every state and country page. Your name, one line on what you supply and a link. Labelled as sponsored.

One sponsor per month

Book the list slot

The campus-file slot

Every campus file carries a “Selling into this campus?” box beside the operator, power and tenant facts. Take it across all 116 files, or only the campuses in your region or power class.

All campuses, or a filtered set

Ask about campus files

The data

The full list as a spreadsheet: operator, owner, tenants, live and planned MW with basis and date, status, first power, chips, cooling, power source and every source link. Ready for a territory plan or a pipeline review.

Spreadsheet, refreshed as campuses change

Request the data

Who reads it

Analysts and investors sizing AI capex, journalists checking a gigawatt claim, and the business-development and engineering teams at the suppliers and operators themselves. They arrive searching for AI data centers, a named project like Stargate Abilene or Colossus, or the campuses in their state.

House rules

Sponsored placements are labelled and sit outside the data. Every campus’s figures, status and position in the list come from its sources alone. Corrections follow the methodology for everyone.

Email hello@aidatacenterlist.com with your company, what you supply and the month you want to start.