Stargate Argentina (Sur Energy)

AI data center in Patagonia, Argentina, operated by Sur Energy.

A planned 500 MW, $25B Stargate campus in Patagonia led by Sur Energy, with OpenAI as the intended buyer of its compute. Announced in October 2025; site and financing were still open in May 2026.

Live power
— Nothing live yet
Planned power
500MW 1 Company
Status
Planned First power not announced
Accelerators
— No audited count published

Power: what each source says

Up to 500 MW under a letter of intent (Argentine government and OpenAI, 2025-10-10). Buenos Aires Times (2026-05-28): not filed under the RIGI incentive regime; Sur Energy still choosing a site and raising funds, targeting construction in 2026 and operations by early 2027.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

OpenAI (letter of intent to buy capacity)

Campus facts

Operator
Sur Energy 1
Owner / developer
Sur Energy 1
City
Not published
State / region
Patagonia (Neuquén, Río Negro or Chubut under evaluation) 1
Country
Argentina 1
First power
Not published
Chips
Not published
GPUs / accelerators
Not published
Cooling
Not published
Power source
mainly renewables (planned) 1
Coordinates
Exact site undisclosed
Verified

Sources

  1. DCD: OpenAI plans 500MW data center in Argentina accessed 2026-11-09
  2. Buenos Aires Times: no trace of mega AI project announced before elections (2026-05-28) accessed 2026-11-09