Scala AI City Eldorado do Sul
AI data center in Eldorado do Sul, Rio Grande do Sul, Brazil.
Scala AI City Eldorado do Sul is a dedicated AI campus in Rio Grande do Sul. The stated buildout is 4,750 MW.
- Live power
- —
- Planned power
- 4,750MW 1
- Status
- Status undisclosed
- Accelerators
- —
Power: what each source says
Initial 54 MW of IT capacity, with potential expansion to 4,750 MW.
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
No tenant named in public sources.
Campus facts
- Tier
- Dedicated AI campus 1
- Operator
- Not published
- Owner / developer
- Not published
- City
- Eldorado do Sul 2
- State / region
- Rio Grande do Sul 2
- Country
- Brazil 3
- First power
- Not published
- Chips
- Not published
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- Not published
- Coordinates
- 30.08° S, 51.62° W (town level)
- Verified
Sources
- Primary source accessed 2026-11-18
- Primary source accessed 2026-11-18
- GeoNames town coordinates accessed 2026-11-18