AI-ready colocation
Find campuses that offer GPU hosting or describe a site-specific liquid cooling design for AI workloads. This list covers 15 campuses.
| Tier | Chips | Tenants | |||||||
|---|---|---|---|---|---|---|---|---|---|
| STACK Hillsboro POR03 | 722 | 2002 | Status undisclosed | AI-ready colocation | Unknown | Hillsboro | — | — | — |
| Éclairion Bruyères-le-Châtel | 601 | 1201 | Operational | AI-ready colocation | Mistral AI | Bruyères-le-Châtel, Île-de-France, France | 2025 | NVIDIA GB300 | Mistral AI |
| Aligned Project Caprock (LBB-01) | — | 5402 | Under construction | AI-ready colocation | Unknown | Abernathy, Texas | — | — | — |
| ODATA DC QR03 Querétaro | — | 3003 | Status undisclosed | AI-ready colocation | Unknown | Mexico | — | — | — |
| atNorth DEN02 | — | 2501 | Status undisclosed | AI-ready colocation | Unknown | Varde, Denmark | — | — | — |
| AirTrunk JHB1 Johor Bahru | — | 1501 | Operational | AI-ready colocation | AirTrunk | Johor Bahru, Malaysia | — | — | — |
| eStruxture CAL-3 | — | 902 | Status undisclosed | AI-ready colocation | Unknown | Alberta, Canada | — | — | — |
| atNorth DEN01 | — | 301 | Operational | AI-ready colocation | CoreWeave | Ballerup, Denmark | — | — | CoreWeave |
| Aligned DFW-04 | — | — | Status undisclosed | AI-ready colocation | Unknown | Plano, Texas | — | — | Lambda |
| atNorth SWE01 | — | — | Operational | AI-ready colocation | Unknown | Stockholm, Sweden | — | — | 6G AI Sweden |
| Equinix Osaka OS3 | — | — | Status undisclosed | AI-ready colocation | Unknown | Osaka, Japan | — | — | — |
| Equinix PA10 Saint-Denis | — | — | Operational | AI-ready colocation | Equinix | Saint-Denis, France | — | — | — |
| ODATA DC SP04 São Paulo | — | — | Status undisclosed | AI-ready colocation | Unknown | Osasco, São Paulo, Brazil | — | — | — |
| STACK Lancaster DFW02 | — | — | Status undisclosed | AI-ready colocation | Unknown | Lancaster, Texas | — | — | — |
| Telekom Industrial AI Cloud (Munich) | — | — | Operational | AI-ready colocation | Deutsche Telekom | Munich, Bavaria, Germany | 2026-02 | NVIDIA Blackwell B200 and RTX PRO | Industrial customers incl. Agile Robots, PhysicsX |
Sources behind the counts and totals
Every count and total on this AI Data Center List page is built from the records listed below, using the filters and units named in the text. Missing values are excluded. Check any figure at its public source, and check scope and calculation rules on the AI Data Center List methodology page.
Contributing records and public sources
- STACK Hillsboro POR03: Primary source; Primary source; GeoNames town coordinates
- Éclairion Bruyères-le-Châtel: eclairion.com; The Next Web: Mistral secures $830M to build its own AI data centre
- Aligned Project Caprock (LBB-01): Aligned Data Centers; Aligned Data Centers
- ODATA DC QR03 Querétaro: Primary source; GeoNames town coordinates; Primary source
- atNorth DEN02: Source; GeoNames town coordinates
- AirTrunk JHB1 Johor Bahru: Primary source; GeoNames town coordinates
- eStruxture CAL-3: Primary source; Primary source
- atNorth DEN01: Source; Source; GeoNames town coordinates
- Aligned DFW-04: Primary source; GeoNames town coordinates
- atNorth SWE01: Source; GeoNames town coordinates
- Equinix Osaka OS3: Primary source; GeoNames town coordinates
- Equinix PA10 Saint-Denis: Primary source; Primary source; Primary source; GeoNames town coordinates
- ODATA DC SP04 São Paulo: Primary source; Primary source; GeoNames town coordinates
- STACK Lancaster DFW02: Primary source; Primary source; GeoNames town coordinates
- Telekom Industrial AI Cloud (Munich): Primary source; DCD: Deutsche Telekom launches Nvidia-powered AI factory in Munich's Tucherpark; Primary source; GeoNames town coordinates