Telekom Industrial AI Cloud (Munich)

AI data center in Munich, Bavaria, Germany, operated by Deutsche Telekom (T-Systems).

Deutsche Telekom's ~€1B 'AI factory' with Nvidia in a Polarise-operated data center at Munich's Tucherpark, opened in early 2026 for German industry. Built with up to 10,000 Blackwell GPUs.

Live power
— No public figure
Planned power
— Not published
Status
Operational First power 2026-02
Accelerators
10,000 Stated by the company

Power: what each source says

No MW published. Up to ~0.5 exaFLOPS AI compute reported. Inaugurated around 2026-02.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Industrial customers incl. Agile Robots, PhysicsX

Campus facts

Operator
Deutsche Telekom (T-Systems) 1
Owner / developer
Polarise (data center); Deutsche Telekom and Nvidia (AI cloud) 1
City
Munich 1
State / region
Bavaria 1
Country
Germany 1
First power
2026-02 1
Chips
NVIDIA DGX B200 and RTX PRO servers ('up to' / 'nearly' 10,000 Blackwell GPUs) 1
GPUs / accelerators
10,000 1
Cooling
Not published
Power source
grid 1
Coordinates
48.15° N, 11.60° E (town level)
Verified

Sources

  1. DCD: Deutsche Telekom launches Nvidia-powered AI factory in Munich's Tucherpark accessed 2026-11-09
  2. heise: Telekom data center with 10,000 Nvidia GPUs in Munich accessed 2026-11-09