Nscale Loughton

AI data center in Loughton, Essex, England, United Kingdom, operated by Nscale.

Nscale's planned 50 MW (up to 90 MW) AI site in Loughton, Essex, announced as a UK supercomputer for Microsoft. Grid power may not arrive until the 2030s and Microsoft reportedly withdrew in October 2026.

Live power
— Nothing live yet
Planned power
90MW 1 Company
Status
Planned First power not announced
Accelerators
— No audited count published

Power: what each source says

50 MW initial, expandable to 90 MW (Nscale). The Guardian reported grid power may not be available until the early-to-mid 2030s; The Telegraph reported Microsoft's exit (2026-10-19).

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

No tenant named in public sources.

Campus facts

Operator
Nscale 1
Owner / developer
Nscale 1
City
Loughton 1
State / region
Essex, England 1
Country
United Kingdom 1
First power
Not published
Chips
Not published
GPUs / accelerators
Not published
Cooling
Not published
Power source
grid 1
Coordinates
51.65° N, 0.07° E (town level)
Verified

Sources

  1. Baxtel: Microsoft exits Nscale's 50 MW Loughton deal (via The Telegraph, 2026-10) accessed 2026-11-09
  2. Data Centre Review: Nscale faces backlash over proposed data centre (2026-03) accessed 2026-11-09
  3. Capacity: Nscale to invest in UK data centres accessed 2026-11-09