Bridge Data Centres MY06 (Sedenak)
AI data center in Kulai (Sedenak Tech Park), Johor, Malaysia, operated by Bridge Data Centres.
A hyperscale campus at Sedenak Tech Park in Johor linked to ByteDance, which opened its first phase with Bridge in 2022. Epoch AI estimates 243 MW of IT power in use; buildings 8-10 look built but idle.
Power: what each source says
Epoch AI estimates 243 MW IT / 315 MW facility as of 2026-09-13. Malaysia's investment authority MIDA announced the phase 1 opening with ByteDance (per Epoch AI's sources).
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Reported ByteDance (likely, per Epoch AI)
“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.
Campus facts
- Operator
- Bridge Data Centres 1
- Owner / developer
- Bridge Data Centres (Bain Capital) 1
- City
- Kulai (Sedenak Tech Park) 1
- State / region
- Johor 1
- Country
- Malaysia 1
- First power
- 2022 1
- Chips
- NVIDIA A100, NVIDIA H100, NVIDIA B200 (Epoch AI) 1
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- Not published
- Coordinates
- 1.70° N, 103.42° E (town level)
- Verified
Sources
- Epoch AI data center profile: Bridge Data Centres MY06 (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09