Nscale Keflavik (Verne)
AI data center in Reykjanesbær (Keflavík), Southern Peninsula, Iceland, operated by Nscale.
Nscale's GB300 NVL72 cluster at Verne's Keflavík campus in Iceland, a 15 MW deployment on geothermal and hydro power. Epoch AI estimates about 5 MW of IT power live, 10 MW by end-2026.
Power: what each source says
Epoch AI estimates 5 MW IT / 7 MW facility as of 2026-07-27; projects ~10 MW IT / 13 MW facility by 2026-12 (estimate). Nscale/Verne announced a 15 MW deployment.
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
No tenant named in public sources.
Campus facts
- Operator
- Nscale 1
- Owner / developer
- Verne 1
- City
- Reykjanesbær (Keflavík) 1
- State / region
- Southern Peninsula 1
- Country
- Iceland 1
- First power
- 2026-04 1
- Chips
- NVIDIA B300 (Epoch AI) 1
- GPUs / accelerators
- Not published
- Cooling
- liquid 1
- Power source
- geothermal and hydro (grid) 1
- Coordinates
- 63.98° N, 22.56° W (town level)
- Verified
Sources
- Epoch AI data center profile: Nscale Keflavik (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
- Nscale: site page or announcement accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09