Google Waltham Cross

AI data center in Waltham Cross (Cheshunt), Hertfordshire, United Kingdom, operated by Google.

Google's first UK-owned data centre, opened in September 2025 north of London as part of a GBP 5B UK investment. Epoch AI estimates about 88 MW of IT power, fully built.

Live power
88MW 1 Epoch AI estimate, as of 2026-04-23
Planned power
124MW 1 Epoch AI estimate
Status
Operational First power 2025-09
Accelerators
— No audited count published

Power: what each source says

Epoch AI estimates 88 MW IT / 124 MW facility as of 2026-04-23.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Google

Campus facts

Operator
Google 1
Owner / developer
Google 1
City
Waltham Cross (Cheshunt) 1
State / region
Hertfordshire 1
Country
United Kingdom 1
First power
2025-09 1
Chips
Google TPU v6e (Epoch AI) 1
GPUs / accelerators
Not published
Cooling
Not published
Power source
grid with contracted renewables (Shell Energy, Engie) 1
Coordinates
51.69° N, 0.03° W (town level)
Verified

Sources

  1. Epoch AI data center profile: Google Waltham Cross (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
  2. Google: site page or announcement accessed 2026-11-09
  3. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09