Google Fort Wayne

AI data center in Fort Wayne, Indiana, operated by Google.

Google's Fort Wayne, Indiana campus approved by the city council in December 2023. Building 2 was being commissioned in August 2026 and six buildings are planned.

Live power
— Nothing live yet
Planned power
1,035MW 3 Epoch AI estimate
Status
Under construction First power 2026
Accelerators
— No audited count published

Power: what each source says

Epoch AI projects ~863 MW IT / 1,035 MW facility with six buildings by mid-2028 (estimate). Satellite review 2026-08-19: building 2 likely in fit-out/commissioning. Google has not published MW.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Google

Campus facts

Operator
Google 1
Owner / developer
Google 1
City
Fort Wayne 1
State / region
Indiana 1
Country
United States 1
First power
2026 1
Chips
Not published
GPUs / accelerators
Not published
Cooling
Not published
Power source
grid 1
Coordinates
41.08° N, 85.14° W (town level)
Verified

Sources

  1. The Local FW: Google's plans in Fort Wayne accessed 2026-11-09
  2. Fort Wayne City Council resolution R-23-12-02 (2023-12-19) accessed 2026-11-09
  3. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09