Meta Cheyenne
AI data center in Cheyenne, Wyoming, operated by Meta.
Meta's Cheyenne, Wyoming data center, announced in 2024 and built by Fortis. Both buildings were live by July 2026 at about 152 MW of IT power (Epoch AI).
Power: what each source says
Epoch AI estimates 152 MW IT / 182 MW facility as of 2026-07-25; projects ~207 MW IT / 249 MW facility by 2027-02 (estimate).
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Meta
Campus facts
Sources
- Epoch AI data center profile: Meta Cheyenne (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
- Meta: site page or announcement accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09