Stargate New Mexico (Project Jupiter)

AI data center in Santa Teresa area, New Mexico, operated by Oracle (for OpenAI).

Project Jupiter in Doña Ana County, New Mexico, a Stargate site for OpenAI with Oracle as operator. Power comes from on-site gas microgrids, with Bloom Energy fuel cells announced in April 2026.

Live power
— Nothing live yet
Planned power
2,200MW 3 Epoch AI estimate
Status
Under construction First power not announced
Accelerators
— No audited count published

Power: what each source says

Epoch AI's April 2026 review projects ~2.2 GW by Q4 2028 (Epoch timeline: 1,750 MW IT / 2,450 MW facility). No company-stated MW total found. Epoch satellite review, 2026-06-22: structural work underway, nothing operational.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

OpenAI

Campus facts

Operator
Oracle (for OpenAI) 1
Owner / developer
BorderPlex Digital Assets (Project Jupiter developer, per Oracle release) 1
City
Santa Teresa area 1
State / region
New Mexico (Doña Ana County) 1
Country
United States 1
First power
Not published
Chips
Not published
GPUs / accelerators
Not published
Cooling
Not published
Power source
gas microgrids and Bloom Energy fuel cells (on-site) 1
Coordinates
31.86° N, 106.67° W (town level)
Verified

Sources

  1. Project Jupiter website accessed 2026-11-09
  2. Oracle, BorderPlex and Bloom Energy to power Project Jupiter with fuel cells (2026-04-27) accessed 2026-11-09
  3. Epoch AI: OpenAI Stargate, where the US sites stand (licence: CC BY 4.0) accessed 2026-11-09