Tesla Cortex (Giga Texas)

AI data center in Austin, Texas, operated by Tesla.

Tesla's in-house AI training clusters at Gigafactory Texas in Austin, used for FSD and Optimus. Cortex 2 came online in April 2026 next to Cortex 1.

Live power
225MW 1 Company figure, as of 2026-Q3
Planned power
225MW 1 Company
Status
Operational First power 2024
Accelerators
— No audited count published

Power: what each source says

Tesla Q3 2026 update (as summarized by analysts): Cortex 1 >105 MW and Cortex 2 >120 MW in production. Q1 2026 deck: Cortex 2 >130,000 H100-equivalents, Cortex 1 >100,000. Some reports cite a 500 MW full design; not confirmed by Tesla.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Tesla

Campus facts

Operator
Tesla 1
Owner / developer
Tesla 1
City
Austin 1
State / region
Texas 1
Country
United States 1
First power
2024 1
Chips
NVIDIA (H100/H200 and newer); >230,000 H100-equivalents across Cortex 1 and 2 (Tesla Q1 2026) 1
GPUs / accelerators
Not published
Cooling
liquid 1
Power source
grid 1
Coordinates
30.22° N, 97.62° W (town level)
Verified

Sources

  1. Converge Digest: Tesla activates Cortex 2 at Giga Texas accessed 2026-11-09
  2. Interesting Engineering: Tesla supercomputer Cortex 2 accessed 2026-11-09