A Core Scientific build at Port Muskogee, Oklahoma, broken ground as a 100 MW HPC data center for CoreWeave. Epoch AI expects building 1 live around end-2026.

Live power
— Nothing live yet
Planned power
181MW 1 Epoch AI estimate
Status
Under construction First power 2026-12
Accelerators
— No audited count published

Power: what each source says

Nothing live per Epoch AI satellite review of 2026-06-13; projects ~153 MW IT / 181 MW facility by 2027-12 (estimate). Epoch projects first building operational ~2026-12 (estimate). Core Scientific and Port Muskogee: 100 MW HPC data center.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Reported OpenAI (speculative, per Epoch AI)

“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.

Campus facts

Operator
CoreWeave 1
Owner / developer
Core Scientific 1
City
Muskogee 1
State / region
Oklahoma 1
Country
United States 1
First power
2026-12 1
Chips
NVIDIA B300 (Epoch AI) 1
GPUs / accelerators
Not published
Cooling
Not published
Power source
Not published
Coordinates
35.75° N, 95.37° W (town level)
Verified