Core Scientific Denton (CoreWeave)
AI data center in Denton, Texas, operated by CoreWeave.
A former bitcoin-mining site in Denton, Texas converted by Core Scientific into high-density AI halls for CoreWeave. The WSJ reported the capacity is rented to OpenAI.
Power: what each source says
Core Scientific Q2 2026: campus operational by mid-2026. Epoch AI estimates 262 MW IT / 367 MW facility as of 2026-09-01, ~282 MW IT / 395 MW facility after a further hall due 2027-05 (TDLR filing; estimate).
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Part reported CoreWeave; OpenAI (reported by WSJ)
“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.
Campus facts
- Operator
- CoreWeave 1
- Owner / developer
- Core Scientific 1
- City
- Denton 1
- State / region
- Texas 1
- Country
- United States 1
- First power
- 2025 1
- Chips
- NVIDIA Blackwell (Epoch AI) 1
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- grid (ERCOT) 1
- Coordinates
- 33.21° N, 97.13° W (town level)
- Verified
Sources
- Core Scientific: Denton, Texas accessed 2026-11-09
- Core Scientific and CoreWeave announce $1.2B Denton expansion accessed 2026-11-09
- WSJ: CoreWeave plans to rent to OpenAI accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09