Amazon's second Madison County, Mississippi campus, next to the Madison Mega Site. Four Trainium buildings run about 228 MW of IT power, on track for about 840 MW by 2028 (Epoch AI).

Live power
228MW 1 Epoch AI estimate, as of 2026-05-15
Planned power
1,008MW 1 Epoch AI estimate
Status
Operational First power 2026-05
Accelerators
— No audited count published

Power: what each source says

Epoch AI estimates 228 MW IT / 273 MW facility as of 2026-05-15; projects ~840 MW IT / 1,008 MW facility by 2028-09 (estimate). Epoch AI links it, speculatively, to Project Rainier.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Reported Anthropic (speculative, per Epoch AI)

“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.

Campus facts

Operator
Amazon Web Services 1
Owner / developer
Amazon 1
City
Ridgeland 1
State / region
Mississippi (Madison County) 1
Country
United States 1
First power
2026-05 1
Chips
AWS Trainium2, AWS Trainium3 (Epoch AI) 1
GPUs / accelerators
Not published
Cooling
Not published
Power source
grid (Entergy Mississippi) 1
Coordinates
32.43° N, 90.13° W (town level)
Verified

Sources

  1. Epoch AI data center profile: Amazon Ridgeland (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09