xAI Colossus 1

AI data center in Memphis, Tennessee, operated by xAI (SpaceXAI, part of SpaceX since 2026).

xAI's first Memphis supercomputer, brought up in 2024. In May 2026 Anthropic agreed to use all of its capacity: more than 300 MW and over 220,000 GPUs.

Live power
300MW 1 Company figure, as of 2026-05
Planned power
300MW 1 Company
Status
Operational First power 2024
Accelerators
220,000 Stated by the company

Power: what each source says

Anthropic (2026-05-06): 'more than 300 MW' and over 220,000 NVIDIA GPUs, all of Colossus 1's capacity, online within the month. Epoch AI estimates 340 MW IT / 425 MW facility as of 2026-06-15.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Anthropic

Campus facts

Operator
xAI (SpaceXAI, part of SpaceX since 2026) 1
Owner / developer
xAI / SpaceX 1
City
Memphis 1
State / region
Tennessee 1
Country
United States 1
First power
2024 1
Chips
NVIDIA H100, H200, GB200 1
GPUs / accelerators
220,000 1
Cooling
liquid 1
Power source
grid (MLGW) plus gas turbines (permitted July 2025, permit under appeal) 1
Coordinates
35.06° N, 90.13° W (town level)
Verified

Sources

  1. Anthropic: higher limits with SpaceX compute (2026-05) accessed 2026-11-09
  2. WSJ: profile of the Colossus data centers accessed 2026-11-09
  3. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09