Meta Los Lunas

AI data center in Los Lunas, New Mexico, operated by Meta.

Meta's Los Lunas, New Mexico campus, where a tent-style AI building went live in October 2026. Epoch AI estimates about 118 MW of IT power, rising to about 218 MW by 2028.

Live power
118MW 1 Epoch AI estimate, as of 2026-10-26
Planned power
273MW 1 Epoch AI estimate
Status
Operational First power 2026-03
Accelerators
— No audited count published

Power: what each source says

Epoch AI estimates 118 MW IT / 147 MW facility as of 2026-10-26; projects ~218 MW IT / 273 MW facility by 2028-01 (estimate).

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Meta

Campus facts

Operator
Meta 1
Owner / developer
Meta 1
City
Los Lunas 1
State / region
New Mexico 1
Country
United States 1
First power
2026-03 1
Chips
NVIDIA B300 (Epoch AI) 1
GPUs / accelerators
Not published
Cooling
Not published
Power source
Not published
Coordinates
34.81° N, 106.73° W (town level)
Verified

Sources

  1. Epoch AI data center profile: Meta Los Lunas (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
  2. Meta: site page or announcement accessed 2026-11-09
  3. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09