AI data center in Temple, Texas, operated by Meta.
Meta's Temple, Texas campus, built by JE Dunn. Building 3 came online in September 2026, taking the site to about 178 MW of IT power (Epoch AI).
Power: what each source says
Epoch AI estimates 178 MW IT / 231 MW facility as of 2026-09-30. JE Dunn lists a 152 MW power capacity for the original buildings.
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Meta
Campus facts
Sources
- Epoch AI data center profile: Meta Temple (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
- Meta: site page or announcement accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09