Applied Digital Polaris Forge 2 (Harwood)

AI data center in Harwood, North Dakota, operated by Undisclosed hyperscaler.

Applied Digital's second North Dakota AI campus near Harwood, with a 15-year, ~$5B lease for 200 MW to an unnamed US investment-grade hyperscaler. The tenant holds a right of first refusal on 800 MW more.

Live power
— Nothing live yet
Planned power
300MW 1 Company
Status
Under construction First power 2026
Accelerators
— No audited count published

Power: what each source says

200 MW leased; campus initially two buildings totaling 300 MW, scalable to ~1 GW. Initial operations planned 2026, full capacity 2027 (Applied Digital). $2.15B financing closed 2026-03.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Part reported Undisclosed US hyperscaler (one local report names Oracle; not confirmed)

“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.

Campus facts

Operator
Undisclosed hyperscaler 1
Owner / developer
Applied Digital 1
City
Harwood 1
State / region
North Dakota 1
Country
United States 1
First power
2026 1
Chips
Not published
GPUs / accelerators
Not published
Cooling
Not published
Power source
grid 1
Coordinates
46.98° N, 96.88° W (town level)
Verified

Sources

  1. DCD: Applied Digital secures $5bn 15-year lease with hyperscaler accessed 2026-11-09
  2. Valley News Live: Applied Digital closes $2.15B deal for Harwood campus (2026-03-10) accessed 2026-11-09