QTS Cedar Rapids (Big Cedar)

AI data center in Cedar Rapids, Iowa, operated by QTS Data Centers.

A Blackstone-owned QTS campus at Big Cedar Industrial Center near Cedar Rapids, Iowa, with seven buildings and a 616 MW MISO load request. SemiAnalysis reports Meta as the tenant; QTS has not confirmed.

Live power
— Nothing live yet
Planned power
1,587MW 4 Epoch AI estimate
Status
Under construction First power 2026
Accelerators
— No audited count published

Power: what each source says

MISO load announcement: 616 MW for 'SNA LLC' in Cedar Rapids. QTS (July 2025): phase 1 late 2026, phase 2 late 2027. Epoch AI projects ~1.13 GW IT / 1.59 GW facility after 7 buildings (estimate); satellite review 2026-10-23: buildings 1-3 commissioning.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Reported Meta (reported by SemiAnalysis, not confirmed)

“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.

Campus facts

Operator
QTS Data Centers 1
Owner / developer
QTS Data Centers (Blackstone) 1
City
Cedar Rapids 1
State / region
Iowa 1
Country
United States 1
First power
2026 1
Chips
Not published
GPUs / accelerators
Not published
Cooling
Not published
Power source
grid (Alliant Energy) 1
Coordinates
41.98° N, 91.67° W (town level)
Verified

Sources

  1. Corridor Business Journal: scope of QTS project in Cedar Rapids accessed 2026-11-09
  2. MISO new load announcements accessed 2026-11-09
  3. SemiAnalysis: Meta compute accessed 2026-11-09
  4. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09