Meta's expanded Eagle Mountain, Utah campus, built by Mortenson. Buildings 1 and 2 of the AI expansion are live at about 133 MW of IT power (Epoch AI).
Power: what each source says
Epoch AI estimates 133 MW IT / 179 MW facility as of 2026-05-02. Williams is building a gas-fired plant next to the campus (air permit application, Feb 2026).
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Meta
Campus facts
- Operator
- Meta 1
- Owner / developer
- Meta 1
- City
- Eagle Mountain 1
- State / region
- Utah 1
- Country
- United States 1
- First power
- 2025-12 1
- Chips
- NVIDIA B300 (Epoch AI) 1
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- grid plus adjacent Williams gas plant (under construction) 1
- Coordinates
- 40.31° N, 112.01° W (town level)
- Verified
Sources
- Epoch AI data center profile: Meta Eagle Mountain (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09