Meta Aiken
AI data center in Trenton (Aiken County), South Carolina, operated by Meta.
Meta's Aiken County, South Carolina data center, built by DPR. Building 2 came online in November 2026, about 129 MW of IT power in all (Epoch AI).
Power: what each source says
Epoch AI estimates 129 MW IT / 168 MW facility as of 2026-11-05.
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Meta
Campus facts
- Operator
- Meta 1
- Owner / developer
- Meta 1
- City
- Trenton (Aiken County) 1
- State / region
- South Carolina 1
- Country
- United States 1
- First power
- 2026-08 1
- Chips
- NVIDIA B300 (Epoch AI) 1
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- Not published
- Coordinates
- 33.74° N, 81.84° W (town level)
- Verified
Sources
- Epoch AI data center profile: Meta Aiken (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
- Meta: site page or announcement accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09