Google's Lincoln, Nebraska campus, planned in seven phases. Building 1 went live in May 2026 at about 141 MW of IT power, with building 2 close behind (Epoch AI).
Power: what each source says
Epoch AI estimates 141 MW IT / 170 MW facility as of 2026-05-12; projects ~283 MW IT / 339 MW facility by 2027-10 (estimate).
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Campus facts
- Operator
- Google 1
- Owner / developer
- Google 1
- City
- Lincoln 1
- State / region
- Nebraska 1
- Country
- United States 1
- First power
- 2026-05 1
- Chips
- Google TPU v6e, Google TPU v7 (Epoch AI) 1
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- Not published
- Coordinates
- 40.81° N, 96.70° W (town level)