Meta Huntsville
AI data center in Huntsville, Alabama, operated by Meta.
Meta's Huntsville, Alabama campus, powered with TVA and contracted solar. Its 2026 expansion brought it to about 146 MW of IT power (Epoch AI).
Power: what each source says
Epoch AI estimates 146 MW IT / 198 MW facility as of 2026-06-02.
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Meta
Campus facts
- Operator
- Meta 1
- Owner / developer
- Meta 1
- City
- Huntsville 1
- State / region
- Alabama 1
- Country
- United States 1
- First power
- 2026-03 1
- Chips
- NVIDIA B300 (Epoch AI) 1
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- grid (TVA) with contracted solar (NextEra, First Solar) 1
- Coordinates
- 34.73° N, 86.59° W (town level)
- Verified