Meta Huntsville

AI data center in Huntsville, Alabama, operated by Meta.

Meta's Huntsville, Alabama campus, powered with TVA and contracted solar. Its 2026 expansion brought it to about 146 MW of IT power (Epoch AI).

Live power
146MW 1 Epoch AI estimate, as of 2026-06-02
Planned power
198MW 1 Epoch AI estimate
Status
Operational First power 2026-03
Accelerators
— No audited count published

Power: what each source says

Epoch AI estimates 146 MW IT / 198 MW facility as of 2026-06-02.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Meta

Campus facts

Operator
Meta 1
Owner / developer
Meta 1
City
Huntsville 1
State / region
Alabama 1
Country
United States 1
First power
2026-03 1
Chips
NVIDIA B300 (Epoch AI) 1
GPUs / accelerators
Not published
Cooling
Not published
Power source
grid (TVA) with contracted solar (NextEra, First Solar) 1
Coordinates
34.73° N, 86.59° W (town level)
Verified

Sources

  1. Epoch AI data center profile: Meta Huntsville (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
  2. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09