Google Cedar Rapids
AI data center in Cedar Rapids, Iowa, operated by Google.
Google's Cedar Rapids, Iowa campus, with a 600 MW load request filed with MISO. Building 1 is due around end-2026 and Epoch AI projects about 261 MW of IT power by mid-2027.
- Live power
- —
- Planned power
- 314MW 1
- Status
- Under construction
- Accelerators
- —
Power: what each source says
Nothing live per Epoch AI satellite review of 2026-04-16; projects ~261 MW IT / 314 MW facility by 2027-05 (estimate). Epoch projects first building operational ~2026-12 (estimate). MISO new-load announcement lists 600 MW for Google in Cedar Rapids.
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Campus facts
Sources
- Epoch AI data center profile: Google Cedar Rapids (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09