IREN Sweetwater Hub
AI data center in Sweetwater, Texas, operated by IREN.
IREN's 2 GW Sweetwater hub in West Texas: Sweetwater 1 (1.4 GW, substation energized 2026) and Sweetwater 2 (600 MW). 300 MW gross of data halls is being built at Sweetwater 1.
- Live power
- —
- Planned power
- 2,000MW 1
- Status
- Under construction
- Accelerators
- —
Power: what each source says
2 GW of grid connections (1.4 GW Sweetwater 1 + 600 MW Sweetwater 2); conditionally included in ERCOT Batch Zero (IREN, Sept 2026). 300 MW gross of data center capacity under construction, delivery targeted Q4 2027.
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
No tenant named in public sources.
Campus facts
Sources
- IREN: 2 GW Sweetwater hub included as base load in ERCOT Batch Zero accessed 2026-11-09
- Baxtel: IREN powers up initial phase of Sweetwater (2026-05) accessed 2026-11-09