STACK NVA02 (Manassas)

AI data center in Manassas, Virginia, operated by STACK Infrastructure.

STACK's NVA02 campus in Manassas, Virginia, with AI buildings under construction across the site. Epoch AI estimates about 85 MW of IT power today and about 348 MW by 2028.

Live power
85MW 1 Epoch AI estimate, as of 2026-02-14
Planned power
487MW 1 Epoch AI estimate
Status
Operational First power 2024
Accelerators
— No audited count published

Power: what each source says

Epoch AI estimates 85 MW IT / 118 MW facility as of 2026-02-14; projects ~348 MW IT / 487 MW facility by 2028-01 (estimate).

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

No tenant named in public sources.

Campus facts

Operator
STACK Infrastructure 1
Owner / developer
STACK Infrastructure 1
City
Manassas 1
State / region
Virginia 1
Country
United States 1
First power
2024 1
Chips
NVIDIA H100 (Epoch AI) 1
GPUs / accelerators
Not published
Cooling
Not published
Power source
Not published
Coordinates
38.75° N, 77.48° W (town level)
Verified

Sources

  1. Epoch AI data center profile: STACK Infrastructure NVA02 (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
  2. STACK Infrastructure: site page or announcement accessed 2026-11-09
  3. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09