STACK NVA02 (Manassas)
AI data center in Manassas, Virginia, operated by STACK Infrastructure.
STACK's NVA02 campus in Manassas, Virginia, with AI buildings under construction across the site. Epoch AI estimates about 85 MW of IT power today and about 348 MW by 2028.
Power: what each source says
Epoch AI estimates 85 MW IT / 118 MW facility as of 2026-02-14; projects ~348 MW IT / 487 MW facility by 2028-01 (estimate).
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
No tenant named in public sources.
Campus facts
- Operator
- STACK Infrastructure 1
- Owner / developer
- STACK Infrastructure 1
- City
- Manassas 1
- State / region
- Virginia 1
- Country
- United States 1
- First power
- 2024 1
- Chips
- NVIDIA H100 (Epoch AI) 1
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- Not published
- Coordinates
- 38.75° N, 77.48° W (town level)
- Verified
Sources
- Epoch AI data center profile: STACK Infrastructure NVA02 (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
- STACK Infrastructure: site page or announcement accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09