TeraWulf Lake Mariner (Fluidstack)

AI data center in Barker, New York, operated by Fluidstack.

TeraWulf's former bitcoin-mining campus on Lake Ontario, converted to AI halls leased to Fluidstack with a Google backstop. Anthropic named New York as a Fluidstack site in its $50B US build-out.

Live power
210MW 3 Epoch AI estimate, as of 2026-10-31
Planned power
441MW 3 Epoch AI estimate
Status
Operational First power 2026-05
Accelerators
— No audited count published

Power: what each source says

TeraWulf (2026-02-26): CB3 energized mid-May 2026, CB4 by Q3 2026, CB5 by Q4 2026. Epoch AI estimates 210 MW IT as of 2026-10-31 and ~378 MW IT / 441 MW facility after CB5 (~2027-03, estimate).

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Part reported Fluidstack; Anthropic (likely); Core42 in a separate hall

“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.

Campus facts

Operator
Fluidstack 1
Owner / developer
TeraWulf (with Google and Blackstone as investors per Epoch AI) 1
City
Barker 1
State / region
New York 1
Country
United States 1
First power
2026-05 1
Chips
Google TPU v7 (Epoch AI estimate) 1
GPUs / accelerators
Not published
Cooling
Not published
Power source
grid 1
Coordinates
43.33° N, 78.55° W (town level)
Verified

Sources

  1. TeraWulf Q4 and FY2025 results (2026-02-26) accessed 2026-11-09
  2. Anthropic: $50 billion in American AI infrastructure accessed 2026-11-09
  3. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09