Meta Montgomery

AI data center in Montgomery, Alabama, operated by Meta.

Meta's Montgomery, Alabama campus, built by Hensel Phelps and expanded in 2025. Buildings 1-2 run about 153 MW of IT power, more than doubling to about 358 MW by early 2027 (Epoch AI).

Live power
153MW 1 Epoch AI estimate, as of 2026-06-18
Planned power
465MW 1 Epoch AI estimate
Status
Operational First power 2026-06
Accelerators
— No audited count published

Power: what each source says

Epoch AI estimates 153 MW IT / 199 MW facility as of 2026-06-18; projects ~358 MW IT / 465 MW facility by 2027-02 (estimate).

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Meta

Campus facts

Operator
Meta 1
Owner / developer
Meta 1
City
Montgomery 1
State / region
Alabama 1
Country
United States 1
First power
2026-06 1
Chips
NVIDIA B300 (Epoch AI) 1
GPUs / accelerators
Not published
Cooling
Not published
Power source
Not published
Coordinates
32.37° N, 86.30° W (town level)
Verified

Sources

  1. Epoch AI data center profile: Meta Montgomery (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
  2. Meta: site page or announcement accessed 2026-11-09
  3. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09