Google's Arcola campus in Loudoun County, Virginia. Building 1 came online in June 2026 at about 77 MW of IT power (Epoch AI).
Power: what each source says
Epoch AI estimates 77 MW IT / 93 MW facility as of 2026-06-16.
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Campus facts
- Operator
- Google 1
- Owner / developer
- Google 1
- City
- Sterling 1
- State / region
- Virginia (Loudoun County) 1
- Country
- United States 1
- First power
- 2026-06 1
- Chips
- Google TPU v6e, Google TPU v7 (Epoch AI) 1
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- Not published
- Coordinates
- 39.01° N, 77.43° W (town level)