CoreWeave Dalton

AI data center in Dalton, Georgia, operated by CoreWeave.

Core Scientific's Dalton, Georgia AI buildings for CoreWeave, completed in late 2025. Epoch AI estimates about 28 MW of IT power with B300s.

Live power
28MW 1 Epoch AI estimate, as of 2026-02-20
Planned power
40MW 1 Epoch AI estimate
Status
Operational First power 2026-02
Accelerators
— No audited count published

Power: what each source says

Epoch AI estimates 28 MW IT / 40 MW facility as of 2026-02-20.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Reported OpenAI (speculative, per Epoch AI)

“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.

Campus facts

Operator
CoreWeave 1
Owner / developer
Core Scientific 1
City
Dalton 1
State / region
Georgia 1
Country
United States 1
First power
2026-02 1
Chips
NVIDIA B300 (Epoch AI) 1
GPUs / accelerators
Not published
Cooling
Not published
Power source
Not published
Coordinates
34.77° N, 84.97° W (town level)
Verified

Sources

  1. Epoch AI data center profile: CoreWeave Dalton 1 & 2 (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
  2. CoreWeave: site page or announcement accessed 2026-11-09
  3. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09