CoreWeave Dalton
AI data center in Dalton, Georgia, operated by CoreWeave.
Core Scientific's Dalton, Georgia AI buildings for CoreWeave, completed in late 2025. Epoch AI estimates about 28 MW of IT power with B300s.
Power: what each source says
Epoch AI estimates 28 MW IT / 40 MW facility as of 2026-02-20.
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Reported OpenAI (speculative, per Epoch AI)
“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.
Campus facts
- Operator
- CoreWeave 1
- Owner / developer
- Core Scientific 1
- City
- Dalton 1
- State / region
- Georgia 1
- Country
- United States 1
- First power
- 2026-02 1
- Chips
- NVIDIA B300 (Epoch AI) 1
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- Not published
- Coordinates
- 34.77° N, 84.97° W (town level)
- Verified
Sources
- Epoch AI data center profile: CoreWeave Dalton 1 & 2 (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
- CoreWeave: site page or announcement accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09