Meta Hyperion (Richland Parish)

AI data center in Holly Ridge, Louisiana, operated by Meta.

Meta's largest planned AI cluster, in Richland Parish, Louisiana, with $50B+ of investment. Entergy is building gas generation for the site.

Live power
— Nothing live yet
Planned power
5,000MW 1 Company
Status
Under construction First power 2028
Accelerators
— No audited count published

Power: what each source says

Meta's site page says 5 GW of compute capacity and elsewhere 'over two gigawatts'; a Meta spokesperson said 2 GW by 2030, scaling to 5 GW later. MISO plan: 1.8 GW substation load. Epoch AI projects first phase (~1.6 GW IT) operational ~2028 (estimate); satellite review 2026-04-19: buildings 1-2 roofed.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Meta

Campus facts

Operator
Meta 1
Owner / developer
Meta 1
City
Holly Ridge 1
State / region
Louisiana (Richland Parish) 1
Country
United States 1
First power
2028 1
Chips
NVIDIA Rubin expected (Epoch AI) 1
GPUs / accelerators
Not published
Cooling
liquid (closed-loop glycol, dry cooling most of the year) 1
Power source
gas (Entergy-built plants) plus grid 1
Coordinates
32.48° N, 91.62° W (town level)
Verified

Sources

  1. Meta: Richland Parish Data Center accessed 2026-11-09
  2. Gizmodo: Meta is building massive gigawatt data centers accessed 2026-11-09
  3. S&P Global Ratings: Hyperion campus research accessed 2026-11-09
  4. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09