QTS Eagle Mountain
AI data center in Eagle Mountain, Utah, operated by QTS Data Centers.
QTS's Eagle Mountain, Utah campus near Meta's own site. Buildings 1-2 are being fitted out, with Epoch AI projecting about 304 MW of IT power by mid-2027.
- Live power
- —
- Planned power
- 411MW 1
- Status
- Under construction
- Accelerators
- —
Power: what each source says
Nothing live per Epoch AI satellite review of 2026-05-02; projects ~304 MW IT / 411 MW facility by 2027-07 (estimate). Epoch projects first building operational ~2026-12 (estimate).
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Reported Meta (speculative, per Epoch AI)
“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.
Campus facts
- Operator
- QTS Data Centers 1
- Owner / developer
- QTS Data Centers (Blackstone) 1
- City
- Eagle Mountain 1
- State / region
- Utah 1
- Country
- United States 1
- First power
- 2026-12 1
- Chips
- NVIDIA B300 (Epoch AI) 1
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- Not published
- Coordinates
- 40.31° N, 112.01° W (town level)
- Verified
Sources
- Epoch AI data center profile: QTS Eagle Mountain (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
- QTS Data Centers: site page or announcement accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09