CoreWeave Chester

AI data center in Chester, Virginia, operated by CoreWeave.

A former Capital One data center in Chester, Virginia that Chirisa refitted for CoreWeave. Two buildings run about 82 MW of IT power, with a third under way (Epoch AI).

Live power
82MW 1 Epoch AI estimate, as of 2026-05-20
Planned power
197MW 1 Epoch AI estimate
Status
Operational First power 2024
Accelerators
— No audited count published

Power: what each source says

Epoch AI estimates 82 MW IT / 114 MW facility as of 2026-05-20; projects ~113 MW IT / 197 MW facility by 2027-06 (estimate).

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Reported OpenAI (speculative, per Epoch AI)

“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.

Campus facts

Operator
CoreWeave 1
Owner / developer
Chirisa Technology Parks (Blue Owl JV) 1
City
Chester 1
State / region
Virginia 1
Country
United States 1
First power
2024 1
Chips
NVIDIA H100, NVIDIA B200 (Epoch AI) 1
GPUs / accelerators
Not published
Cooling
Not published
Power source
Not published
Coordinates
37.36° N, 77.44° W (town level)
Verified

Sources

  1. Epoch AI data center profile: CoreWeave Chester VA (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
  2. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09