CoreWeave at Bulk N01
AI data center in Øvrebø (Vennesla), Agder, Norway, operated by CoreWeave.
CoreWeave's capacity at Bulk Infrastructure's N01 campus in southern Norway, on hydro power. Epoch AI estimates about 42 MW of IT power live since 2025.
Power: what each source says
Epoch AI estimates 42 MW IT / 55 MW facility as of 2026-08-15. Bulk plans a five-data-center N01 campus and raised $410M for expansion.
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Reported OpenAI (speculative, per Epoch AI)
“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.
Campus facts
- Operator
- CoreWeave 1
- Owner / developer
- Bulk Infrastructure 1
- City
- Øvrebø (Vennesla) 1
- State / region
- Agder 1
- Country
- Norway 1
- First power
- 2025-07 1
- Chips
- NVIDIA B200 (Epoch AI) 1
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- hydro (grid) 1
- Coordinates
- 58.28° N, 7.88° E (town level)
- Verified
Sources
- Epoch AI data center profile: CoreWeave Norway (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
- CoreWeave: site page or announcement accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09