DayOne Kempas

AI data center in Johor Bahru (Kempas), Johor, Malaysia, operated by DayOne.

DayOne's second big Johor campus, a few kilometres from Nusajaya. Epoch AI puts it at about 422 MW of IT power after buildings 7-8 came online in October 2026, making it one of the largest AI sites outside the US.

Live power
422MW 1 Epoch AI estimate, as of 2026-10-01
Planned power
590MW 1 Epoch AI estimate
Status
Operational First power 2026-01
Accelerators
— No audited count published

Power: what each source says

Epoch AI estimates 422 MW IT / 590 MW facility as of 2026-10-01. DayOne reported 390 MW "in service" across Johor in early 2026. FT reported Alibaba and ByteDance train models in southeast Asia; Epoch names no user for this site.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

No tenant named in public sources.

Campus facts

Operator
DayOne 1
Owner / developer
DayOne 1
City
Johor Bahru (Kempas) 1
State / region
Johor 1
Country
Malaysia 1
First power
2026-01 1
Chips
NVIDIA B300 (Epoch AI) 1
GPUs / accelerators
Not published
Cooling
Not published
Power source
Not published
Coordinates
1.54° N, 103.71° E (town level)
Verified

Sources

  1. Epoch AI data center profile: DayOne Kempas (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
  2. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09