QTS Hillsboro 2 (Meta)
AI data center in Hillsboro, Oregon, operated by QTS Data Centers.
A four-building QTS campus in Hillsboro, Oregon that Epoch AI ties to Meta; QTS and Meta jointly signed a 120 MWac solar deal for Oregon. About 180 MW of IT power is live.
Power: what each source says
Epoch AI estimates 180 MW IT / 243 MW facility as of 2026-04-17.
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Reported Meta (likely, per Epoch AI)
“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.
Campus facts
- Operator
- QTS Data Centers 1
- Owner / developer
- QTS Data Centers (Blackstone) 1
- City
- Hillsboro 1
- State / region
- Oregon 1
- Country
- United States 1
- First power
- 2023 1
- Chips
- NVIDIA H100 (Epoch AI) 1
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- grid (Portland General Electric) with contracted solar (Avangrid) 1
- Coordinates
- 45.52° N, 122.99° W (town level)
- Verified
Sources
- Epoch AI data center profile: Meta-QTS Hillsboro 2 (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09