QTS Hillsboro 2 (Meta)

AI data center in Hillsboro, Oregon, operated by QTS Data Centers.

A four-building QTS campus in Hillsboro, Oregon that Epoch AI ties to Meta; QTS and Meta jointly signed a 120 MWac solar deal for Oregon. About 180 MW of IT power is live.

Live power
180MW 1 Epoch AI estimate, as of 2026-04-17
Planned power
243MW 1 Epoch AI estimate
Status
Operational First power 2023
Accelerators
— No audited count published

Power: what each source says

Epoch AI estimates 180 MW IT / 243 MW facility as of 2026-04-17.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Reported Meta (likely, per Epoch AI)

“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.

Campus facts

Operator
QTS Data Centers 1
Owner / developer
QTS Data Centers (Blackstone) 1
City
Hillsboro 1
State / region
Oregon 1
Country
United States 1
First power
2023 1
Chips
NVIDIA H100 (Epoch AI) 1
GPUs / accelerators
Not published
Cooling
Not published
Power source
grid (Portland General Electric) with contracted solar (Avangrid) 1
Coordinates
45.52° N, 122.99° W (town level)
Verified

Sources

  1. Epoch AI data center profile: Meta-QTS Hillsboro 2 (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
  2. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09