Microsoft Fairwater Atlanta (Fayetteville)

AI data center in Fayetteville, Georgia, operated by Microsoft.

The second Fairwater site, in Fayetteville, Georgia, which began operating in October 2025 and links to Wisconsin over Microsoft's AI WAN as one 'AI superfactory'. Two-story buildings with GB200 NVL72 racks.

Live power
636MW 2 Epoch AI estimate, as of 2026-06-14
Planned power
859MW 2 Epoch AI estimate
Status
Operational First power 2025-10
Accelerators
— No audited count published

Power: what each source says

Microsoft gives no MW figure. Epoch AI estimates 636 MW IT / 859 MW facility with buildings 1-4 operational as of 2026-06-14 (estimate).

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Part reported Microsoft; OpenAI (likely, per Epoch AI)

“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.

Campus facts

Operator
Microsoft 1
Owner / developer
Microsoft 1
City
Fayetteville 1
State / region
Georgia 1
Country
United States 1
First power
2025-10 1
Chips
NVIDIA GB200 NVL72 (Blackwell) 1
GPUs / accelerators
Not published
Cooling
liquid 1
Power source
grid (Georgia Power) 1
Coordinates
33.45° N, 84.45° W (town level)
Verified

Sources

  1. Microsoft: From Wisconsin to Atlanta, Microsoft's first AI superfactory (2025-11-12) accessed 2026-11-09
  2. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09