Microsoft Fairwater Atlanta (Fayetteville)
AI data center in Fayetteville, Georgia, operated by Microsoft.
The second Fairwater site, in Fayetteville, Georgia, which began operating in October 2025 and links to Wisconsin over Microsoft's AI WAN as one 'AI superfactory'. Two-story buildings with GB200 NVL72 racks.
Power: what each source says
Microsoft gives no MW figure. Epoch AI estimates 636 MW IT / 859 MW facility with buildings 1-4 operational as of 2026-06-14 (estimate).
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Part reported Microsoft; OpenAI (likely, per Epoch AI)
“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.
Campus facts
- Operator
- Microsoft 1
- Owner / developer
- Microsoft 1
- City
- Fayetteville 1
- State / region
- Georgia 1
- Country
- United States 1
- First power
- 2025-10 1
- Chips
- NVIDIA GB200 NVL72 (Blackwell) 1
- GPUs / accelerators
- Not published
- Cooling
- liquid 1
- Power source
- grid (Georgia Power) 1
- Coordinates
- 33.45° N, 84.45° W (town level)
- Verified
Sources
- Microsoft: From Wisconsin to Atlanta, Microsoft's first AI superfactory (2025-11-12) accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09