Meta Bowling Green (Middleton Township)

AI data center in Bowling Green, Ohio, operated by Meta.

A Meta AI campus near Bowling Green, Ohio, paired with the 350 MW behind-the-meter Apollo gas plant. Buildings 1-2 were under construction in mid-2026.

Live power
— Nothing live yet
Planned power
570MW 2 Epoch AI estimate
Status
Under construction First power 2027
Accelerators
— No audited count published

Power: what each source says

Epoch AI projects ~422 MW IT / 570 MW facility once four buildings are done (~2028) and building 1 operational ~2027-02 (estimates). Apollo Power Generation Project: 350 MW (Ohio Power Siting Board).

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Meta

Campus facts

Operator
Meta 1
Owner / developer
Meta 1
City
Bowling Green 1
State / region
Ohio 1
Country
United States 1
First power
2027 1
Chips
Not published
GPUs / accelerators
Not published
Cooling
Not published
Power source
gas (on-site Apollo plant, Williams) plus grid 1
Coordinates
41.37° N, 83.65° W (town level)
Verified

Sources

  1. Ohio Power Siting Board announcement (archived) accessed 2026-11-09
  2. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09