AI data centers in United States

United States has 87 AI data centers on our list: 62 operational, 22 under construction and 3 planned. They run about 12,669 MW today and plan 69.5 GW in total. The largest by live power is AWS Project Rainier (New Carlisle) in New Carlisle, Indiana (1,037 MW). The biggest plan is Fermi America Project Matador (HyperGrid) at 17 GW. Operators here: Amazon Web Services, xAI, Microsoft, Oracle, Meta, Google, CoreWeave, QTS Data Centers, Tesla, Fluidstack, STACK Infrastructure, Stream Data Centers, Core42, IREN, Nebius, Vantage Data Centers, Fermi America, Poolside Infrastructure Company, Undisclosed, SB Energy, Crusoe, Undisclosed hyperscaler, Lambda and SoftBank. Data as of 9 Nov 2026.

United States

87 sites
110°W 100°W 90°W 80°W 25°N 30°N 35°N 40°N 45°N Fermi America Project Matador (HyperGrid), Amarillo area, Texas. Under construction. Planned 17,000 MW, live —. Meta Hyperion (Richland Parish), Holly Ridge, Louisiana. Under construction. Planned 5,000 MW, live —. Microsoft Fairwater Wisconsin (Mount Pleasant), Mount Pleasant, Wisconsin. Operational. Planned 2,715 MW, live 369 MW. AWS Project Rainier (New Carlisle), New Carlisle, Indiana. Operational. Planned 2,300 MW, live 1,037 MW. Stargate New Mexico (Project Jupiter), Santa Teresa area, New Mexico. Under construction. Planned 2,200 MW, live —. IREN Sweetwater Hub, Sweetwater, Texas. Under construction. Planned 2,000 MW, live —. Project Jade, Cheyenne (Tallgrass), Cheyenne, Wyoming. Planned. Planned 1,800 MW, live —. QTS Cedar Rapids (Big Cedar), Cedar Rapids, Iowa. Under construction. Planned 1,587 MW, live —. xAI Colossus 2, Memphis, Tennessee. Operational. Planned 1,500 MW, live 946 MW. Stargate Shackelford County (Vantage Frontier), Shackelford County, Texas. Under construction. Planned 1,400 MW, live —. Stargate Michigan (Saline Township), Saline Township, Michigan. Under construction. Planned 1,383 MW, live —. Stargate Wisconsin (Port Washington), Port Washington, Wisconsin. Under construction. Planned 1,300 MW, live —. Google Armstrong County (Goodnight), Claude (Armstrong County), Texas. Under construction. Planned 1,294 MW, live —. Stargate Abilene, Abilene, Texas. Operational. Planned 1,200 MW, live 618 MW. Google Fort Wayne, Fort Wayne, Indiana. Under construction. Planned 1,035 MW, live —. Amazon Ridgeland, Ridgeland, Mississippi. Operational. Planned 1,008 MW, live 228 MW. Meta Prometheus (New Albany), New Albany, Ohio. Operational. Planned 1,000 MW, live 471 MW. Meta El Paso, El Paso, Texas. Under construction. Planned 1,000 MW, live —. Crusoe Abilene expansion (Microsoft), Abilene, Texas. Under construction. Planned 900 MW, live —. Microsoft Fairwater Atlanta (Fayetteville), Fayetteville, Georgia. Operational. Planned 859 MW, live 636 MW. AWS Madison County (Canton, Mississippi), Canton, Mississippi. Operational. Planned 819 MW, live 284 MW. Galaxy Helios (CoreWeave), Afton, Texas. Operational. Planned 800 MW, live 132 MW. IREN Childress (Horizon), Childress, Texas. Operational. Planned 750 MW, live 50 MW. Meta Bowling Green (Middleton Township), Bowling Green, Ohio. Under construction. Planned 570 MW, live —. STACK NVA02 (Manassas), Manassas, Virginia. Operational. Planned 487 MW, live 85 MW. Google Omaha, Omaha, Nebraska. Operational. Planned 474 MW, live 237 MW. Meta Montgomery, Montgomery, Alabama. Operational. Planned 465 MW, live 153 MW. Google Columbus (South High Street), Columbus, Ohio. Operational. Planned 464 MW, live 303 MW. Google Pryor, Pryor, Oklahoma. Operational. Planned 442 MW, live 368 MW. TeraWulf Lake Mariner (Fluidstack), Barker, New York. Operational. Planned 441 MW, live 210 MW. QTS Eagle Mountain, Eagle Mountain, Utah. Under construction. Planned 411 MW, live —. AWS New Albany, New Albany, Ohio. Operational. Planned 405 MW, live 213 MW. Google New Albany, New Albany, Ohio. Operational. Planned 400 MW, live 333 MW. Applied Digital Polaris Forge 1 (Ellendale), Ellendale, North Dakota. Operational. Planned 400 MW, live 68 MW. Core Scientific Denton (CoreWeave), Denton, Texas. Operational. Planned 395 MW, live 262 MW. Google Storey County (Tahoe Reno), McCarran (Tahoe Reno Industrial Center), Nevada. Operational. Planned 389 MW, live 161 MW. Google Lincoln, Lincoln, Nebraska. Operational. Planned 339 MW, live 141 MW. QTS Richmond 3, Sandston, Virginia. Operational. Planned 336 MW, live 144 MW. QTS Richmond 1, Sandston, Virginia. Operational. Planned 333 MW, live 238 MW. Google Cedar Rapids, Cedar Rapids, Iowa. Under construction. Planned 314 MW, live —. xAI Colossus 1, Memphis, Tennessee. Operational. Planned 300 MW, live 300 MW. Nebius Vineland (New Jersey), Vineland, New Jersey. Operational. Planned 300 MW, live 50 MW. Applied Digital Polaris Forge 2 (Harwood), Harwood, North Dakota. Under construction. Planned 300 MW, live —. CoreWeave Lancaster, Lancaster, Pennsylvania. Under construction. Planned 300 MW, live —. Google Bristow, Bristow, Virginia. Operational. Planned 286 MW, live 238 MW. Google Council Bluffs (East), Council Bluffs, Iowa. Operational. Planned 284 MW, live 237 MW. Google Papillion, Papillion, Nebraska. Operational. Planned 284 MW, live 237 MW. Meta Los Lunas, Los Lunas, New Mexico. Operational. Planned 273 MW, live 118 MW. Stream Data Centers Phoenix (Goodyear), Goodyear, Arizona. Operational. Planned 267 MW, live 64 MW. Microsoft Goodyear, Goodyear, Arizona. Operational. Planned 263 MW, live 202 MW. QTS Richmond 2, Sandston, Virginia. Operational. Planned 252 MW, live 180 MW. Meta Cheyenne, Cheyenne, Wyoming. Operational. Planned 249 MW, live 152 MW. QTS Hillsboro 2 (Meta), Hillsboro, Oregon. Operational. Planned 243 MW, live 180 MW. Meta Jeffersonville, Jeffersonville, Indiana. Operational. Planned 241 MW, live 178 MW. Meta Rosemount, Rosemount, Minnesota. Operational. Planned 241 MW, live 178 MW. Google Mesa, Mesa, Arizona. Operational. Planned 237 MW, live 183 MW. Meta Temple, Temple, Texas. Operational. Planned 231 MW, live 178 MW. Microsoft Project Osmium (West Des Moines), Cumming (West Des Moines), Iowa. Operational. Planned 228 MW, live 190 MW. Tesla Cortex (Giga Texas), Austin, Texas. Operational. Planned 225 MW, live 225 MW. AWS Berwick (Susquehanna), Berwick, Pennsylvania. Operational. Planned 212 MW, live 108 MW. Meta Kuna, Kuna, Idaho. Operational. Planned 198 MW, live 152 MW. Meta Huntsville, Huntsville, Alabama. Operational. Planned 198 MW, live 146 MW. CoreWeave Chester, Chester, Virginia. Operational. Planned 197 MW, live 82 MW. Google The Dalles, The Dalles, Oregon. Operational. Planned 185 MW, live 154 MW. Google Red Oak, Red Oak, Texas. Operational. Planned 185 MW, live 77 MW. CoreWeave Muskogee, Muskogee, Oklahoma. Under construction. Planned 181 MW, live —. Meta Eagle Mountain, Eagle Mountain, Utah. Operational. Planned 179 MW, live 133 MW. Vantage TX1 (San Antonio), San Antonio, Texas. Operational. Planned 179 MW, live 32 MW. Meta Aiken, Trenton (Aiken County), South Carolina. Operational. Planned 168 MW, live 129 MW. Google Lancaster, Lancaster, Ohio. Operational. Planned 164 MW, live 137 MW. Google Kansas City (Hunt Midwest), Kansas City, Missouri. Operational. Planned 126 MW, live 105 MW. Google Midlothian, Midlothian, Texas. Operational. Planned 123 MW, live 103 MW. Meta Gallatin, Gallatin, Tennessee. Operational. Planned 114 MW, live 87 MW. Microsoft SAT40 (San Antonio), San Antonio, Texas. Operational. Planned 106 MW, live 75 MW. Meta Sarpy, Springfield (Sarpy County), Nebraska. Operational. Planned 105 MW, live 80 MW. Lambda Kansas City AI factory, Kansas City, Missouri. Planned. Planned 100 MW, live —. Google Arcola, Sterling, Virginia. Operational. Planned 93 MW, live 77 MW. CoreWeave Marble, Marble, North Carolina. Operational. Planned 91 MW, live 65 MW. Microsoft SAT14 (San Antonio), San Antonio, Texas. Operational. Planned 66 MW, live 47 MW. Core42 at Lake Mariner, Barker, New York. Operational. Planned 58 MW, live 58 MW. CoreWeave Dalton, Dalton, Georgia. Operational. Planned 40 MW, live 28 MW. xAI Atlanta (QTS), Atlanta, Georgia. Operational. Planned 24 MW, live 17 MW. Google Haskell County, Haskell, Texas. Under construction. Planned —, live —. Stargate Lordstown, Lordstown, Ohio. Under construction. Planned —, live —. Fermi America Project MatadorMeta HyperionMicrosoft Fairwater WisconsinStargate New MexicoIREN Sweetwater HubProject Jade, Cheyenne Meta HyperionQTS Cedar RapidsMeta El Paso

Also in the list, without a plotted position: Poolside Project Horizon, Stargate Milam County, Cipher Barber Lake (Fluidstack)

List of AI data centers in United States

ChipsTenants
AWS Project Rainier (New Carlisle)1,037est32,300est3OperationalAmazon Web ServicesNew Carlisle, Indiana2025AWS Trainium2 ('nearly half a million' across Project Rainier, Amazon)Anthropic
xAI Colossus 2946est31,500est3OperationalxAIMemphis, Tennessee2025-10NVIDIA GB200 / GB300 (Blackwell)Part reportedxAI; Anthropic and Cursor reported as users (Epoch AI, citing company posts)
Microsoft Fairwater Atlanta (Fayetteville)636est2859est2OperationalMicrosoftFayetteville, Georgia2025-10NVIDIA GB200 NVL72 (Blackwell)Part reportedMicrosoft; OpenAI (likely, per Epoch AI)
Stargate Abilene61821,2001OperationalOracleAbilene, Texas2025-09NVIDIA GB200 / GB300 (Blackwell)OpenAI
Meta Prometheus (New Albany)471est31,0001OperationalMetaNew Albany, Ohio2025-10NVIDIA GB300 (Epoch AI)Meta
Microsoft Fairwater Wisconsin (Mount Pleasant)369est42,715est4OperationalMicrosoftMount Pleasant, Wisconsin2026-04NVIDIA GB200 NVL72 ('hundreds of thousands' of GB200s, Microsoft)Part reportedMicrosoft; OpenAI (likely, per Epoch AI)
Google Pryor368est3442est3OperationalGooglePryor, Oklahoma2024Google TPU (v4, v5e, v5p)Google
Google New Albany333est1400est1OperationalGoogleNew Albany, Ohio2024Google TPU v5e, Google TPU v5p, Google TPU v6e (Epoch AI)Google
Google Columbus (South High Street)303est3464est3OperationalGoogleColumbus, Ohio2024Google TPU v5e, v5p, v6e, v7 (Epoch AI)Google
xAI Colossus 130013001OperationalxAIMemphis, Tennessee2024NVIDIA H100, H200, GB200Anthropic
AWS Madison County (Canton, Mississippi)284est3819est3OperationalAmazon Web ServicesCanton, Mississippi2025AWS Trainium2 (Epoch AI estimate)ReportedAnthropic (reported, not confirmed)
Core Scientific Denton (CoreWeave)262est4395est1OperationalCoreWeaveDenton, Texas2025NVIDIA Blackwell (Epoch AI)Part reportedCoreWeave; OpenAI (reported by WSJ)
QTS Richmond 1238est1333est1OperationalQTS Data CentersSandston, Virginia2024——
Google Bristow238est1286est1OperationalGoogleBristow, Virginia2024Google TPU v5e, Google TPU v5p, Google TPU v6e, Google TPU v7 (Epoch AI)Google
Google Omaha237est1474est1OperationalGoogleOmaha, Nebraska2024Google TPU v5e, Google TPU v5p, Google TPU v6e, Google TPU v7 (Epoch AI)Google
Google Council Bluffs (East)237est1284est1OperationalGoogleCouncil Bluffs, Iowa2024Google TPU v5e, Google TPU v6e, Google TPU v5p, Google TPU v7 (Epoch AI)Google
Google Papillion237est1284est1OperationalGooglePapillion, Nebraska2023Google TPU v4, Google TPU v5e, Google TPU v5p (Epoch AI)Google
Amazon Ridgeland228est11,008est1OperationalAmazon Web ServicesRidgeland, Mississippi2026-05AWS Trainium2, AWS Trainium3 (Epoch AI)ReportedAnthropic (speculative, per Epoch AI)
Tesla Cortex (Giga Texas)22512251OperationalTeslaAustin, Texas2024NVIDIA (H100/H200 and newer); >230,000 H100-equivalents across Cortex 1 and 2 (Tesla Q1 2026)Tesla
AWS New Albany213est1405est1OperationalAmazon Web ServicesNew Albany, Ohio2024AWS Trainium2, NVIDIA H100, NVIDIA H200, NVIDIA B200 (Epoch AI)—
TeraWulf Lake Mariner (Fluidstack)210est3441est3OperationalFluidstackBarker, New York2026-05Google TPU v7 (Epoch AI estimate)Part reportedFluidstack; Anthropic (likely); Core42 in a separate hall
Microsoft Goodyear202est1263est1OperationalMicrosoftGoodyear, Arizona2023NVIDIA H100, NVIDIA B200 (Epoch AI)Part reportedMicrosoft; OpenAI (likely, per Epoch AI and SemiAnalysis)
Microsoft Project Osmium (West Des Moines)190est1228est1OperationalMicrosoftCumming (West Des Moines), Iowa2021NVIDIA A100, NVIDIA H100, NVIDIA B200 (Epoch AI)Part reportedMicrosoft; OpenAI (speculative, per Epoch AI)
Google Mesa183est1237est1OperationalGoogleMesa, Arizona2025-07Google TPU v6e, Google TPU v5p (Epoch AI)Google
QTS Richmond 2180est1252est1OperationalQTS Data CentersSandston, Virginia2025-02——
QTS Hillsboro 2 (Meta)180est1243est1OperationalQTS Data CentersHillsboro, Oregon2023NVIDIA H100 (Epoch AI)ReportedMeta (likely, per Epoch AI)
Meta Jeffersonville178est1241est1OperationalMetaJeffersonville, Indiana2026-06NVIDIA B300 (Epoch AI)Meta
Meta Rosemount178est1241est1OperationalMetaRosemount, Minnesota2026-06NVIDIA B200 (Epoch AI)Meta
Meta Temple178est1231est1OperationalMetaTemple, Texas2025-12NVIDIA B300 (Epoch AI)Meta
Google Storey County (Tahoe Reno)161est1389est1OperationalGoogleMcCarran (Tahoe Reno Industrial Center), Nevada2023Google TPU v5e, Google TPU v4, Google TPU v6e, Google TPU v5p (Epoch AI)Google
Google The Dalles154est1185est1OperationalGoogleThe Dalles, Oregon2025-03Google TPU v6e, Google TPU v5p, Google TPU v5e, Google TPU v7 (Epoch AI)Google
Meta Montgomery153est1465est1OperationalMetaMontgomery, Alabama2026-06NVIDIA B300 (Epoch AI)Meta
Meta Cheyenne152est1249est1OperationalMetaCheyenne, Wyoming2026-07NVIDIA B300 (Epoch AI)Meta
Meta Kuna152est1198est1OperationalMetaKuna, Idaho2026-06NVIDIA B300 (Epoch AI)Meta
Meta Huntsville146est1198est1OperationalMetaHuntsville, Alabama2026-03NVIDIA B300 (Epoch AI)Meta
QTS Richmond 3144est1336est1OperationalQTS Data CentersSandston, Virginia2026-02——
Google Lincoln141est1339est1OperationalGoogleLincoln, Nebraska2026-05Google TPU v6e, Google TPU v7 (Epoch AI)Google
Google Lancaster137est1164est1OperationalGoogleLancaster, Ohio2024Google TPU v5e, Google TPU v6e (Epoch AI)Google
Meta Eagle Mountain133est1179est1OperationalMetaEagle Mountain, Utah2025-12NVIDIA B300 (Epoch AI)Meta
Galaxy Helios (CoreWeave)132est38001OperationalCoreWeaveAfton, Texas2026NVIDIA Blackwell (Epoch AI)CoreWeave
Meta Aiken129est1168est1OperationalMetaTrenton (Aiken County), South Carolina2026-08NVIDIA B300 (Epoch AI)Meta
Meta Los Lunas118est1273est1OperationalMetaLos Lunas, New Mexico2026-03NVIDIA B300 (Epoch AI)Meta
AWS Berwick (Susquehanna)108est1212est1OperationalAmazon Web ServicesBerwick, Pennsylvania2025-09AWS Trainium2, AWS Trainium3 (Epoch AI)ReportedAnthropic (speculative, per Epoch AI)
Google Kansas City (Hunt Midwest)105est1126est1OperationalGoogleKansas City, Missouri2026-08—Google
Google Midlothian103est1123est1OperationalGoogleMidlothian, Texas2026-04Google TPU v7, Google TPU v6e (Epoch AI)Google
Meta Gallatin87est1114est1OperationalMetaGallatin, Tennessee2026-08NVIDIA B300 (Epoch AI)Meta
STACK NVA02 (Manassas)85est1487est1OperationalSTACK InfrastructureManassas, Virginia2024NVIDIA H100 (Epoch AI)—
CoreWeave Chester82est1197est1OperationalCoreWeaveChester, Virginia2024NVIDIA H100, NVIDIA B200 (Epoch AI)ReportedOpenAI (speculative, per Epoch AI)
Meta Sarpy80est1105est1OperationalMetaSpringfield (Sarpy County), Nebraska2026-08NVIDIA B300 (Epoch AI)Meta
Google Red Oak77est1185est1OperationalGoogleRed Oak, Texas2025-08Google TPU v6e (Epoch AI)Google
Google Arcola77est193est1OperationalGoogleSterling, Virginia2026-06Google TPU v6e, Google TPU v7 (Epoch AI)Google
Microsoft SAT40 (San Antonio)75est1106est1OperationalMicrosoftSan Antonio, Texas2024NVIDIA H100, NVIDIA B300 (Epoch AI)Microsoft
Applied Digital Polaris Forge 1 (Ellendale)68est44001OperationalCoreWeaveEllendale, North Dakota2025-10NVIDIA Blackwell (Epoch AI)CoreWeave
CoreWeave Marble65est191est1OperationalCoreWeaveMarble, North Carolina2026-03NVIDIA B200 (Epoch AI)ReportedOpenAI (speculative, per Epoch AI)
Stream Data Centers Phoenix (Goodyear)64est1267est1OperationalStream Data CentersGoodyear, Arizona2026-05NVIDIA H100 (Epoch AI)—
Core42 at Lake Mariner58est158est1OperationalCore42Barker, New York2025-10NVIDIA B200 (Epoch AI)ReportedG42 (likely, per Epoch AI)
IREN Childress (Horizon)5017501OperationalIRENChildress, Texas2026-08NVIDIA GB300Microsoft
Nebius Vineland (New Jersey)50est43001OperationalNebiusVineland, New Jersey2026NVIDIA GB300 (Microsoft-Nebius deal covers ~100,000 GB300, Tom's Hardware)ReportedMicrosoft (likely, per Epoch AI)
Microsoft SAT14 (San Antonio)47est166est1OperationalMicrosoftSan Antonio, Texas2024NVIDIA H100, NVIDIA B300 (Epoch AI)Microsoft
Vantage TX1 (San Antonio)32est1179est1OperationalVantage Data CentersSan Antonio, Texas2026-02NVIDIA B200 (Epoch AI)—
CoreWeave Dalton28est140est1OperationalCoreWeaveDalton, Georgia2026-02NVIDIA B300 (Epoch AI)ReportedOpenAI (speculative, per Epoch AI)
xAI Atlanta (QTS)17est124est1OperationalxAIAtlanta, Georgia2025-02NVIDIA H100, NVIDIA A100 (Epoch AI)xAI; X Corp
Fermi America Project Matador (HyperGrid)—17,0001Under constructionFermi AmericaAmarillo area, Texas2027AMD Instinct (TensorWave lease)TensorWave (binding lease, phase 1: 222 MW)
Meta Hyperion (Richland Parish)—5,0001Under constructionMetaHolly Ridge, Louisiana2028NVIDIA Rubin expected (Epoch AI)Meta
Stargate New Mexico (Project Jupiter)—2,200est3Under constructionOracleSanta Teresa area, New Mexico——OpenAI
IREN Sweetwater Hub—2,0001Under constructionIRENSweetwater, Texas2027——
Poolside Project Horizon—2,0001PlannedPoolside Infrastructure CompanyPecos County, Texas———
Project Jade, Cheyenne (Tallgrass)—1,8001PlannedUndisclosedCheyenne, Wyoming———
QTS Cedar Rapids (Big Cedar)—1,587est4Under constructionQTS Data CentersCedar Rapids, Iowa2026—ReportedMeta (reported by SemiAnalysis, not confirmed)
Stargate Shackelford County (Vantage Frontier)—1,4001Under constructionOracleShackelford County, Texas2026NVIDIA Rubin expected (Epoch AI)OpenAI
Stargate Michigan (Saline Township)—1,3832Under constructionOracleSaline Township, Michigan——OpenAI
Stargate Wisconsin (Port Washington)—1,300est3Under constructionOraclePort Washington, Wisconsin——OpenAI
Google Armstrong County (Goodnight)—1,294est1Under constructionGoogleClaude (Armstrong County), Texas2027-03NVIDIA B300, NVIDIA Rubin (Epoch AI)Google
Stargate Milam County—1,2001Under constructionSB EnergyMilam County, Texas——OpenAI
Google Fort Wayne—1,035est3Under constructionGoogleFort Wayne, Indiana2026—Google
Meta El Paso—1,0001Under constructionMetaEl Paso, Texas——Meta
Crusoe Abilene expansion (Microsoft)—9001Under constructionCrusoeAbilene, Texas2027—Microsoft
Meta Bowling Green (Middleton Township)—570est2Under constructionMetaBowling Green, Ohio2027—Meta
QTS Eagle Mountain—411est1Under constructionQTS Data CentersEagle Mountain, Utah2026-12NVIDIA B300 (Epoch AI)ReportedMeta (speculative, per Epoch AI)
Google Cedar Rapids—314est1Under constructionGoogleCedar Rapids, Iowa2026-12—Google
Applied Digital Polaris Forge 2 (Harwood)—3001Under constructionUndisclosed hyperscalerHarwood, North Dakota2026—Part reportedUndisclosed US hyperscaler (one local report names Oracle; not confirmed)
Cipher Barber Lake (Fluidstack)—3001Under constructionFluidstackTexas2026Google TPU (likely, per Epoch AI)Part reportedFluidstack; Anthropic (per Epoch AI)
CoreWeave Lancaster—3001Under constructionCoreWeaveLancaster, Pennsylvania2027——
CoreWeave Muskogee—181est1Under constructionCoreWeaveMuskogee, Oklahoma2026-12NVIDIA B300 (Epoch AI)ReportedOpenAI (speculative, per Epoch AI)
Lambda Kansas City AI factory—1001PlannedLambdaKansas City, Missouri2026NVIDIA Blackwell Ultra (more than 10,000)Single undisclosed Lambda customer
Google Haskell County——Under constructionGoogleHaskell, Texas2027—Google
Stargate Lordstown——Under constructionSoftBankLordstown, Ohio——OpenAI

Other locations

Full map and list