A $10 billion AWS campus at the Madison Mega Site near Canton, Mississippi. SemiAnalysis and Epoch AI link it to Anthropic and Trainium; Amazon has not confirmed the tenant.
Power: what each source says
Epoch AI estimates 284 MW IT (five buildings) as of 2026-06-04 and ~683 MW IT / 819 MW facility once 12 buildings are done (~2028, estimate). Amazon: $10B investment, completion expected by 2027 (DCD).
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
Reported Anthropic (reported, not confirmed)
“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.
Campus facts
- Operator
- Amazon Web Services 1
- Owner / developer
- Amazon 1
- City
- Canton 1
- State / region
- Mississippi 1
- Country
- United States 1
- First power
- 2025 1
- Chips
- AWS Trainium2 (Epoch AI estimate) 1
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- grid 1
- Coordinates
- 32.61° N, 90.04° W (town level)
- Verified
Sources
- DCD: AWS confirmed as company behind $10bn Mississippi data center accessed 2026-11-09
- SemiAnalysis: Amazon's AI resurgence accessed 2026-11-09
- Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09