AWS Madison County (Canton, Mississippi)

AI data center in Canton, Mississippi, operated by Amazon Web Services.

A $10 billion AWS campus at the Madison Mega Site near Canton, Mississippi. SemiAnalysis and Epoch AI link it to Anthropic and Trainium; Amazon has not confirmed the tenant.

Live power
284MW 3 Epoch AI estimate, as of 2026-06-04
Planned power
819MW 3 Epoch AI estimate
Status
Operational First power 2025
Accelerators
— No audited count published

Power: what each source says

Epoch AI estimates 284 MW IT (five buildings) as of 2026-06-04 and ~683 MW IT / 819 MW facility once 12 buildings are done (~2028, estimate). Amazon: $10B investment, completion expected by 2027 (DCD).

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Reported Anthropic (reported, not confirmed)

“Reported” means a press outlet or Epoch AI named the tenant and neither the operator nor the tenant has confirmed it. The outlet is named in brackets and listed under sources.

Campus facts

Operator
Amazon Web Services 1
Owner / developer
Amazon 1
City
Canton 1
State / region
Mississippi 1
Country
United States 1
First power
2025 1
Chips
AWS Trainium2 (Epoch AI estimate) 1
GPUs / accelerators
Not published
Cooling
Not published
Power source
grid 1
Coordinates
32.61° N, 90.04° W (town level)
Verified

Sources

  1. DCD: AWS confirmed as company behind $10bn Mississippi data center accessed 2026-11-09
  2. SemiAnalysis: Amazon's AI resurgence accessed 2026-11-09
  3. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09