Google Mesa

AI data center in Mesa, Arizona, operated by Google.

Google's Mesa, Arizona campus, running TPU v5p and v6e. Building 2 came online in 2026, taking it to about 183 MW of IT power by Epoch AI's estimate.

Live power
183MW 1 Epoch AI estimate, as of 2026-08-15
Planned power
237MW 1 Epoch AI estimate
Status
Operational First power 2025-07
Accelerators
— No audited count published

Power: what each source says

Epoch AI estimates 183 MW IT / 237 MW facility as of 2026-08-15.

Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.

Tenants

Google

Campus facts

Operator
Google 1
Owner / developer
Google 1
City
Mesa 1
State / region
Arizona 1
Country
United States 1
First power
2025-07 1
Chips
Google TPU v6e, Google TPU v5p (Epoch AI) 1
GPUs / accelerators
Not published
Cooling
Not published
Power source
Not published
Coordinates
33.42° N, 111.83° W (town level)
Verified

Sources

  1. Epoch AI data center profile: Google Mesa (CC-BY 4.0) (licence: CC BY 4.0) accessed 2026-11-09
  2. Epoch AI, AI data centers dataset (CC-BY 4.0, updated 2026-11-06) (licence: CC BY 4.0) accessed 2026-11-09