AI data centers in Texas

Texas has 21 AI data centers on our list: 11 operational, 9 under construction and 1 planned. They run about 1,799 MW today and plan 31.4 GW in total. The largest by live power is Stargate Abilene in Abilene (618 MW). The biggest plan is Fermi America Project Matador (HyperGrid) at 17 GW. Operators here: Oracle, CoreWeave, Tesla, Meta, Google, Microsoft, IREN, Vantage Data Centers, Fermi America, Poolside Infrastructure Company, SB Energy, Crusoe and Fluidstack. Data as of 9 Nov 2026.

Texas

21 sites
Fermi America Project Matador (HyperGrid), Amarillo area, Texas. Under construction. Planned 17,000 MW, live —. IREN Sweetwater Hub, Sweetwater, Texas. Under construction. Planned 2,000 MW, live —. Stargate Shackelford County (Vantage Frontier), Shackelford County, Texas. Under construction. Planned 1,400 MW, live —. Google Armstrong County (Goodnight), Claude (Armstrong County), Texas. Under construction. Planned 1,294 MW, live —. Stargate Abilene, Abilene, Texas. Operational. Planned 1,200 MW, live 618 MW. Meta El Paso, El Paso, Texas. Under construction. Planned 1,000 MW, live —. Crusoe Abilene expansion (Microsoft), Abilene, Texas. Under construction. Planned 900 MW, live —. Galaxy Helios (CoreWeave), Afton, Texas. Operational. Planned 800 MW, live 132 MW. IREN Childress (Horizon), Childress, Texas. Operational. Planned 750 MW, live 50 MW. Core Scientific Denton (CoreWeave), Denton, Texas. Operational. Planned 395 MW, live 262 MW. Meta Temple, Temple, Texas. Operational. Planned 231 MW, live 178 MW. Tesla Cortex (Giga Texas), Austin, Texas. Operational. Planned 225 MW, live 225 MW. Google Red Oak, Red Oak, Texas. Operational. Planned 185 MW, live 77 MW. Vantage TX1 (San Antonio), San Antonio, Texas. Operational. Planned 179 MW, live 32 MW. Google Midlothian, Midlothian, Texas. Operational. Planned 123 MW, live 103 MW. Microsoft SAT40 (San Antonio), San Antonio, Texas. Operational. Planned 106 MW, live 75 MW. Microsoft SAT14 (San Antonio), San Antonio, Texas. Operational. Planned 66 MW, live 47 MW. Google Haskell County, Haskell, Texas. Under construction. Planned —, live —. Fermi America Project MatadorIREN Sweetwater HubGoogle Armstrong CountyStargate AbileneMeta El PasoGalaxy HeliosIREN ChildressCore Scientific Denton IREN Sweetwater HubGoogle Armstrong CountyStargate Abilene

Also in the list, without a plotted position: Cipher Barber Lake (Fluidstack), Poolside Project Horizon, Stargate Milam County

List of AI data centers in Texas

ChipsTenants
Stargate Abilene61821,2001OperationalOracleAbilene, Texas2025-09NVIDIA GB200 / GB300 (Blackwell)OpenAI
Core Scientific Denton (CoreWeave)262est4395est1OperationalCoreWeaveDenton, Texas2025NVIDIA Blackwell (Epoch AI)Part reportedCoreWeave; OpenAI (reported by WSJ)
Tesla Cortex (Giga Texas)22512251OperationalTeslaAustin, Texas2024NVIDIA (H100/H200 and newer); >230,000 H100-equivalents across Cortex 1 and 2 (Tesla Q1 2026)Tesla
Meta Temple178est1231est1OperationalMetaTemple, Texas2025-12NVIDIA B300 (Epoch AI)Meta
Galaxy Helios (CoreWeave)132est38001OperationalCoreWeaveAfton, Texas2026NVIDIA Blackwell (Epoch AI)CoreWeave
Google Midlothian103est1123est1OperationalGoogleMidlothian, Texas2026-04Google TPU v7, Google TPU v6e (Epoch AI)Google
Google Red Oak77est1185est1OperationalGoogleRed Oak, Texas2025-08Google TPU v6e (Epoch AI)Google
Microsoft SAT40 (San Antonio)75est1106est1OperationalMicrosoftSan Antonio, Texas2024NVIDIA H100, NVIDIA B300 (Epoch AI)Microsoft
IREN Childress (Horizon)5017501OperationalIRENChildress, Texas2026-08NVIDIA GB300Microsoft
Microsoft SAT14 (San Antonio)47est166est1OperationalMicrosoftSan Antonio, Texas2024NVIDIA H100, NVIDIA B300 (Epoch AI)Microsoft
Vantage TX1 (San Antonio)32est1179est1OperationalVantage Data CentersSan Antonio, Texas2026-02NVIDIA B200 (Epoch AI)—
Fermi America Project Matador (HyperGrid)—17,0001Under constructionFermi AmericaAmarillo area, Texas2027AMD Instinct (TensorWave lease)TensorWave (binding lease, phase 1: 222 MW)
IREN Sweetwater Hub—2,0001Under constructionIRENSweetwater, Texas2027——
Poolside Project Horizon—2,0001PlannedPoolside Infrastructure CompanyPecos County, Texas———
Stargate Shackelford County (Vantage Frontier)—1,4001Under constructionOracleShackelford County, Texas2026NVIDIA Rubin expected (Epoch AI)OpenAI
Google Armstrong County (Goodnight)—1,294est1Under constructionGoogleClaude (Armstrong County), Texas2027-03NVIDIA B300, NVIDIA Rubin (Epoch AI)Google
Stargate Milam County—1,2001Under constructionSB EnergyMilam County, Texas——OpenAI
Meta El Paso—1,0001Under constructionMetaEl Paso, Texas——Meta
Crusoe Abilene expansion (Microsoft)—9001Under constructionCrusoeAbilene, Texas2027—Microsoft
Cipher Barber Lake (Fluidstack)—3001Under constructionFluidstackTexas2026Google TPU (likely, per Epoch AI)Part reportedFluidstack; Anthropic (per Epoch AI)
Google Haskell County——Under constructionGoogleHaskell, Texas2027—Google

Other locations

Full map and list