AI data centers in Texas
Texas has 21 AI data centers on our list: 11 operational, 9 under construction and 1 planned. They run about 1,799 MW today and plan 31.4 GW in total. The largest by live power is Stargate Abilene in Abilene (618 MW). The biggest plan is Fermi America Project Matador (HyperGrid) at 17 GW. Operators here: Oracle, CoreWeave, Tesla, Meta, Google, Microsoft, IREN, Vantage Data Centers, Fermi America, Poolside Infrastructure Company, SB Energy, Crusoe and Fluidstack. Data as of 9 Nov 2026.
Texas
21 sitesAlso in the list, without a plotted position: Cipher Barber Lake (Fluidstack), Poolside Project Horizon, Stargate Milam County
List of AI data centers in Texas
| Chips | Tenants | |||||||
|---|---|---|---|---|---|---|---|---|
| Stargate Abilene | 6182 | 1,2001 | Operational | Oracle | Abilene, Texas | 2025-09 | NVIDIA GB200 / GB300 (Blackwell) | OpenAI |
| Core Scientific Denton (CoreWeave) | 262est4 | 395est1 | Operational | CoreWeave | Denton, Texas | 2025 | NVIDIA Blackwell (Epoch AI) | Part reportedCoreWeave; OpenAI (reported by WSJ) |
| Tesla Cortex (Giga Texas) | 2251 | 2251 | Operational | Tesla | Austin, Texas | 2024 | NVIDIA (H100/H200 and newer); >230,000 H100-equivalents across Cortex 1 and 2 (Tesla Q1 2026) | Tesla |
| Meta Temple | 178est1 | 231est1 | Operational | Meta | Temple, Texas | 2025-12 | NVIDIA B300 (Epoch AI) | Meta |
| Galaxy Helios (CoreWeave) | 132est3 | 8001 | Operational | CoreWeave | Afton, Texas | 2026 | NVIDIA Blackwell (Epoch AI) | CoreWeave |
| Google Midlothian | 103est1 | 123est1 | Operational | Midlothian, Texas | 2026-04 | Google TPU v7, Google TPU v6e (Epoch AI) | ||
| Google Red Oak | 77est1 | 185est1 | Operational | Red Oak, Texas | 2025-08 | Google TPU v6e (Epoch AI) | ||
| Microsoft SAT40 (San Antonio) | 75est1 | 106est1 | Operational | Microsoft | San Antonio, Texas | 2024 | NVIDIA H100, NVIDIA B300 (Epoch AI) | Microsoft |
| IREN Childress (Horizon) | 501 | 7501 | Operational | IREN | Childress, Texas | 2026-08 | NVIDIA GB300 | Microsoft |
| Microsoft SAT14 (San Antonio) | 47est1 | 66est1 | Operational | Microsoft | San Antonio, Texas | 2024 | NVIDIA H100, NVIDIA B300 (Epoch AI) | Microsoft |
| Vantage TX1 (San Antonio) | 32est1 | 179est1 | Operational | Vantage Data Centers | San Antonio, Texas | 2026-02 | NVIDIA B200 (Epoch AI) | — |
| Fermi America Project Matador (HyperGrid) | — | 17,0001 | Under construction | Fermi America | Amarillo area, Texas | 2027 | AMD Instinct (TensorWave lease) | TensorWave (binding lease, phase 1: 222 MW) |
| IREN Sweetwater Hub | — | 2,0001 | Under construction | IREN | Sweetwater, Texas | 2027 | — | — |
| Poolside Project Horizon | — | 2,0001 | Planned | Poolside Infrastructure Company | Pecos County, Texas | — | — | — |
| Stargate Shackelford County (Vantage Frontier) | — | 1,4001 | Under construction | Oracle | Shackelford County, Texas | 2026 | NVIDIA Rubin expected (Epoch AI) | OpenAI |
| Google Armstrong County (Goodnight) | — | 1,294est1 | Under construction | Claude (Armstrong County), Texas | 2027-03 | NVIDIA B300, NVIDIA Rubin (Epoch AI) | ||
| Stargate Milam County | — | 1,2001 | Under construction | SB Energy | Milam County, Texas | — | — | OpenAI |
| Meta El Paso | — | 1,0001 | Under construction | Meta | El Paso, Texas | — | — | Meta |
| Crusoe Abilene expansion (Microsoft) | — | 9001 | Under construction | Crusoe | Abilene, Texas | 2027 | — | Microsoft |
| Cipher Barber Lake (Fluidstack) | — | 3001 | Under construction | Fluidstack | Texas | 2026 | Google TPU (likely, per Epoch AI) | Part reportedFluidstack; Anthropic (per Epoch AI) |
| Google Haskell County | — | — | Under construction | Haskell, Texas | 2027 | — |