Pure DC Seinäjoki SJK01
AI data center in Seinäjoki, Finland.
Pure DC is building a dedicated AI campus in Finland. The stated buildout is 110 MW.
- Live power
- —
- Planned power
- 110MW 1
- Status
- Under construction
- Accelerators
- —
Power: what each source says
Phase 1 will deliver 110 MW of IT capacity; further expansion is potential.
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
No tenant named in public sources.
Campus facts
- Tier
- Dedicated AI campus 1
- Operator
- Not published
- Owner / developer
- Pure DC 1
- City
- Seinäjoki 1
- State / region
- Not published
- Country
- Finland 1
- First power
- Not published
- Chips
- Not published
- GPUs / accelerators
- Not published
- Cooling
- air and direct liquid cooling 1
- Power source
- Not published
- Coordinates
- 62.79° N, 22.83° E (town level)
- Verified
Sources
- Source accessed 2026-11-18
- GeoNames town coordinates accessed 2026-11-18