Applied Digital Delta Forge 1
AI data center in Boyce, Louisiana.
Applied Digital Delta Forge 1 is a dedicated AI campus in Boyce. The stated buildout is 300 MW.
- Live power
- —
- Planned power
- 300MW 1
- Status
- Under construction
- Accelerators
- —
Power: what each source says
Applied Digital plans 300 MW of critical IT load from an initial 430 MW of utility power.
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
No tenant named in public sources.
Campus facts
- Tier
- Dedicated AI campus 1
- Operator
- Not published
- Owner / developer
- Not published
- City
- Boyce 2
- State / region
- Louisiana 3
- Country
- United States 1
- First power
- Not published
- Chips
- Not published
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- Not published
- Coordinates
- 31.39° N, 92.67° W (town level)
- Verified
Sources
- ir.applieddigital.com accessed 2026-11-18
- ir.applieddigital.com accessed 2026-11-18
- ir.applieddigital.com accessed 2026-11-18
- GeoNames town coordinates accessed 2026-11-18