Applied Digital Delta Forge 2
AI data center in Alabama.
Applied Digital Delta Forge 2 is a dedicated AI campus in Alabama. The stated buildout is 210 MW.
- Live power
- —
- Planned power
- 210MW 4
- Status
- Under construction
- Accelerators
- —
Power: what each source says
210 MW contracted critical IT load, company fiscal 2026 filing.
Figures labelled Epoch AI are estimates from satellite imagery, permits and filings. Company figures come from the operator, owner or its filings. IT power is what the servers draw; in Epoch AI’s figures for these campuses it runs about 15–35% below total facility power.
Tenants
No tenant named in public sources.
Campus facts
- Tier
- Dedicated AI campus 1
- Operator
- Not published
- Owner / developer
- Not published
- City
- Not published
- State / region
- Alabama 2
- Country
- United States 3
- First power
- Not published
- Chips
- Not published
- GPUs / accelerators
- Not published
- Cooling
- Not published
- Power source
- Not published
- Coordinates
- 33.26° N, 87.32° W (town level)
- Verified
Sources
- ir.applieddigital.com accessed 2026-11-18
- Primary source accessed 2026-11-18
- GeoNames town coordinates accessed 2026-11-18
- Primary source accessed 2026-11-18